CESSNA
SECTION 4
MODEL 172S NAV III
NORMAL PROCEDURES
GFC 700 AFCS
U.S.
BEFORE STARTING ENGINE
1.
Preflight Inspection - COMPLETE
2.
Passenger Briefing - COMPLETE
3.
Seats and Seat Belts - ADJUST and LOCK (verify inertia reel
locking)
4.
Brakes - TEST and SET
5.
Circuit Breakers - CHECK IN
6.
Electrical Equipment - OFF
7.
AVIONICS Switch (BUS 1 and BUS 2) - OFF
CAUTION
THE AVIONICS SWITCH (BUS 1 AND BUS 2) MUST BE
OFF DURING ENGINE START TO PREVENT POSSIBLE
DAMAGE TO AVIONICS.
8.
FUEL SELECTOR Valve - BOTH
9.
FUEL SHUTOFF Valve - ON (push full in)
172SPHBUS-00
4-11
Summary of Contents for Cessna C172S PIM
Page 2: ......
Page 4: ......
Page 16: ......
Page 18: ......
Page 20: ......
Page 22: ......
Page 52: ......
Page 82: ......
Page 118: ......
Page 168: ......
Page 179: ...CESSNA SECTION 5 MODEL 172S NAV III PERFORMANCE GFC 700 AFCS U S Figure 5 3 5 13 172SPHBUS 02...
Page 192: ......
Page 208: ......
Page 218: ......
Page 320: ......
Page 322: ......