BHT-212-MM-1
5-00-00
Export Classification C, ECCN EAR99
Chapter 26
2.
Functionally check baggage compartment smoke detector.
Chapter 67
3.
Synchronized elevator:
a.
Remove left and right elevators.
b.
Clean elevator spars and inspect for corrosion.
c.
Clean internal bore of elevator horn and inspect for
corrosion.
d.
With elevator control removed, attach a spring scale to
hole in arm of horn where control tube is normally installed. Pull
scale at right angle to arm, verify friction is 26 to 32 pounds
(115.65 to 142.34 N). If friction is not within limits, adjust shim
thickness.
e.
Install left and right elevators.
SCHEDULED INSPECTIONS
5-14.
600 HOURS/12 MONTHS — PART B (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
26 JUN 2013
Rev. 14
Page 97/98
Summary of Contents for Bell 212
Page 6: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 27: ......
Page 35: ......
Page 75: ......
Page 83: ......
Page 121: ......
Page 141: ......
Page 153: ......
Page 155: ......
Page 159: ......
Page 163: ......
Page 165: ......
Page 167: ......
Page 169: ......
Page 171: ......
Page 173: ......
Page 175: ......
Page 177: ......
Page 179: ......
Page 183: ......
Page 187: ......
Page 189: ......
Page 191: ......
Page 193: ......
Page 199: ......
Page 201: ......
Page 207: ......
Page 209: ......
Page 211: ......
Page 215: ......
Page 223: ......
Page 225: ......
Page 231: ......
Page 243: ......
Page 253: ......
Page 261: ......