background image

1/2

1

PRE-INSTALLATION CHART

Art. T50

Hydroline

 (h: mm 590)

67101076400  2015.02

R 6

62

0

1700

1768 ± 

1

688 ± 

1

44

 ± 

1

1766 ± 

1

1766 ± 

1

50

0

1730

1766 ± 

1

430

680

480

85

85

min 20

0

1950

min 98

5

85

min 20

0

620

1700

1780

680

1760

700

507

1295

J

I

1/2"

Facing for sunken 

installation

Facing for flush 

installation

ELECTRICAL CHARACTERISTICS

V

Hz

Power consumption

W

K074 (optional)

220 - 240

50/60

15

MY / MY-F

220 - 240

50/60

1000

HYDRAULIC CHARACTERISTICS

Water capacity (1)

lt

Emptying time (2)

min.

No. of Jets

Overflow water flow 

rate

l/min.

310

9

32

-

8

Net Weight

kg

Floor Load

kg/m

2

Delivery Weight

kg

Delivery dimensions

cm

68

450

101

191 x 82 x 83

N.B. Measurements must be taken once the floors and walls are finished. For the 

correct operation of the product, we recommend installing it on surfaces where 

floor level heating is not used.

BATHTUB INSTALLATION

It is advisable to position the bathtub, make the necessary connections and 

check the water-tightness of the system before building the perimeter walls. 

Before building the perimetre walls, it is advisable to position the bathtub and 

make the necessary connections. It is mandatory to create a removable panel 

on the side of the tank (l), as shown in the relevant picture, which allows both 

system inspection and ventilation; the panel must be provided with openings, 

of at least 0,05 sqm in total, to allow system ventilation. Build the perimeter 

wall also on taps and control side and always provide an inspection panel (J) 

to carry out system maintenance operations, as shown in the picture. When 

making the panel, follow the dimensions indicated in the diagram. The panel must 

be fastened securely in place (e.g. with screws) so that a tool must be used to 

remove it, as provided for by current safety standards. Envisage a clearance of at 

least 40 cm in front of the removable panels.

(1) At overflow level - (2) Measurement taken at Teuco siphon outlet, with the bathtub filled up to overflow level.

Measurements in mm

  -  Connection of water mixed for ½” water sheet spout

  -  Electrical connection

I, J - Inspection and ventilation panels

Reviews: