27
10
. M
A
IN
TE
N
A
NC
E
•
Refer to the supplementary documents for information on maintaining suppli-
er components.
WARNING: Shut down the wind turbine system immediately if the rotor
blades or the electrical wiring are damaged.
10.1 SAFETY PRECAUTIONS DURING
MAINTENANCE WROK
•
Shut down the wind turbine system (section 8.2).
10.2 INSPECTION & MAINTENANCE SCHEDULE
WARNING: Risk of injury when carrying out maintenance work! X Shut
down the wind turbine system prior to all maintenance work. X Take steps
to prevent the wind turbine system from being switched on again by
unauthorized persons.
Interval
Component
Activity
Daily
Wind turbine
Check for abnormal noises
Rotor blades
Check that the blades turn
freely
Tower
Inspect for damage
Yearly twice / at end
of winter or after
extreme weather
events
Rotor blade
Inspect for cracks / damage
and if necessary, replace
Treat with underbody protec-
tion wax
Are the rotor blades balanced?
Mounting Base
Check for vibration
Check the guy wires
Is the Base mounted properly?
Inspect for damage
Wind turbine
Check the bolts
Electrical wiring
Inspect the cables for damage
INSPECTION SCHEDULE
MAGNUM 5 (MADE IN EUROPE)
Summary of Contents for MAGNUM 5
Page 2: ...2 PRODUCT OVERVIEW MAGNUM 5 MADE IN EUROPE MAGNUM 5 ...
Page 11: ...11 4 1 1 POWER CURVE 4 PARAMETER DIMENSIONS POWER CURVE MAGNUM 5 MADE IN EUROPE ...
Page 14: ...14 5 2 WIRING DIAGRAM 5 CONTROLLER WIRING DIAGRAM MAGNUM 5 MADE IN EUROPE ...
Page 30: ...30 12 DECLARATION MAGNUM 5 MADE IN EUROPE DECLARATIONS ...
Page 32: ...32 14 NOTES NOTES ...
Page 33: ...33 HEADQUARTERS TESUP HEADQUATERS 22 SUTTON LANE NORTH CHISWICK LONDON W4 4LD UNITED KINGDOM ...