20
7.
PR
E
-
U
S
E
P
REP
AR
A
TI
O
N
7.3 UNPACKING THE COMPONENTS
•
Carefully open the packaging.
•
Check the shipment for completeness (refer to the shipping documents).
•
Separate the packaging material and dispose of it in an environmentally
responsible way.
7.4 ASSEMBLING THE WIND TURBINE
Turbine Assembly:
•
Complete the mounting pole (MP) installation as specified.
•
Add your cable (the one to connect the wind turbine and the charge control-
ler) of the necessary length to the 3
-
phase AC output cables at the wind tur-
bine output and make sure that you have properly electrically insulated them.
•
First of all, remove the cables you have added by passing them through the
MP.
•
After removing the cables from the outlet, place your MAGNUM 5 wind turbine
on the MP and tighten the fixing screws on the mast.
•
Place the blades on the flange in any order and screw them correctly.
•
Attach the wing, set nose to the flange so that it includes the wings and fix it
by screwing it correctly.
MAGNUM 5 (MADE IN EUROPE)
NOTE: You must first input the battery
-
inverter to the charge control
Summary of Contents for MAGNUM 5
Page 2: ...2 PRODUCT OVERVIEW MAGNUM 5 MADE IN EUROPE MAGNUM 5 ...
Page 11: ...11 4 1 1 POWER CURVE 4 PARAMETER DIMENSIONS POWER CURVE MAGNUM 5 MADE IN EUROPE ...
Page 14: ...14 5 2 WIRING DIAGRAM 5 CONTROLLER WIRING DIAGRAM MAGNUM 5 MADE IN EUROPE ...
Page 30: ...30 12 DECLARATION MAGNUM 5 MADE IN EUROPE DECLARATIONS ...
Page 32: ...32 14 NOTES NOTES ...
Page 33: ...33 HEADQUARTERS TESUP HEADQUATERS 22 SUTTON LANE NORTH CHISWICK LONDON W4 4LD UNITED KINGDOM ...