
17 |
P a g e
INSTALLATION
S
HELVING
I
NSTALLATION
Perform the following steps to install the FOV shelves:
1. Install 4 clips for each shelf in the slots located on the sides of the chamber interior.
a. Squeeze each clip.
b. Insert the top tabs first, then the bottom tabs using a rocking motion.
2. Place the shelves on the clips.
A
CCESS
P
ORT
S
TOPPER
Verify the port stopper is installed in the access port on the back of the unit. The
oven will not meet its temperature performance specifications without the stopper
installed.
The stopper must always be installed on the outside of the oven.
Figure 7: Port Stopper
in Access Port
Figure 5: Install Clips
Figure 6: Place the Shelf
Summary of Contents for FOV Series
Page 2: ...2 P a g e This page left blank...
Page 18: ...18 P a g e INSTALLATION This page left blank...
Page 43: ......