11
2.4 Connecting the UPS Power Cables
WARNING!!!
A separate power line should be used to supply the UPS AC input. Never use the same
line to supply another electrical device. Do not use any additional cable to increase the
length of the UPS’s input cable. It is advised to use an MCCB suitable for the input current
on the UPS’s input line.
The connection of the electrical panel should be supplied by a grounded outlet.
Otherwise, the UPS
and the load connected to the output will be left ungrounded. The grounding system must
be checked, and must be strengthen if required. Potential difference between ground and
neutral must be less than 3V AC.
Descriptions of the UPS input output cable connection terminals are shown in figure 2.1
Recommended input line cable and fuse ratings are given in the table below.
NOTES:
The neutral conductor should be sized for 1,5 times the output/bypass phase current. These
recommendations are for guideline purposes only and are superceded by local regulations
and codes of practice.
2.5 Safety Earth
The safety earth cable must be connected to the earth BUS BAR and bonded to each cabinet in the system
and also the earthing and neutral bonding arrangements must be in accordance with the local laws.
ATTENTION!!!
Failure to follow adequate earthing procedures can result in electric shock hazard to
personnel, or the risk of fire.
2.6 Cable connection procedure
WARNING!!! All connections of the UPS must be done by qualified service personnel
After positioning the UPS, the cables must be connected as described below:
1. Verify all switches and fuses in front of the UPS are at
“0”
position. (OFF)
2. Connect the 3 phase AC input coming from the mains distribution panel to the AC input terminals as
shown on the label. (Figure 2.1)
ATTENTION!!!: ENSURE CORRECT PHASE SEQUENCE.
If there is a phase sequence error, UPS doesn’t transfer the load to INVERTER output. If
you can’t see SYNC:OK in the INFORMATION MENU on LCD, then change the input phase sequence.
3. Connect the output of the UPS to the load distribution panel.
4. Connect the battery groups. Refer to battery installation section.
UPS
power
(kVA)
Recommended cable size (mm
2
)
Line
input
Bypass input /
UPS output
External
Battery
Input / output
Cable
connections
U-V-W-N
Battery
connections
+ & -
INPUT
Fuses
Output/
Bypass
Fuses
Battery
Fuses
10
10
10
6
16mm
2
terminal 16mm
2
terminal
50A
32A
32A
15
10
10
10
16mm
2
terminal 16mm
2
terminal
50A
32A
32A
20
10
10
10
16mm
2
terminal 16mm
2
terminal
50A
32A
32A
30
16
16
16
16mm
2
terminal 16mm
2
terminal
63A
40A
50A
Summary of Contents for DS300SHA Series
Page 1: ...DS300SHA SERIES DSP Controlled UPS Pf 0 8 10 15 20 30 kVA 3 Phase IN 3 Phase OUT USER MANUAL ...
Page 2: ......
Page 17: ...14 Figure 2 3 External Battery Connections 60x12V 30x12V Batteries 30x12V Batteries ...
Page 18: ...15 Figure 2 3a DS300SHA Series 10 15 20 30 KVA Internal Battery Connections 60x12V 5Ah ...
Page 19: ...16 Figure 2 3a DS300SHA Series 10 15 20 30 KVA Internal Battery Connections 60x12V 7 9Ah ...
Page 56: ......
Page 57: ...AGKK12611 10 2021 ...