Assembly Precautions
The assembly of the system and putting it into use should be performed in accordance
with the current regulation, standard and this manual.
A proper installation circuit should be installed in order to protect the boiler against
flue gas condensation.
Power connections should be installed in accordance with the current standards and
regulations. Water and fuel pipes should never be used as ground connection.
Shaft connections should be installed in accordance with standards and regulations.
The distance between the boiler and the shaft as well as the number of the ells used
should be kept at a minimum. The shaft should be isolated against condensation.
The entire system (shaft, electric, water, fuel) should be checked against leaks
following the assembly.
The entire weight of the big and heavy burners should be lifted by well adjusted
supports instead of the boiler’s front lid.
Check for gas leaks before turning on the boiler, if you suspect there might
be a leak, do not turn on the boiler before resolving the problem.
Only for propane burning boilers – A certain smell has been put into your propane
feeder so any gas leaks can be noticed.
- Propane gas accumulates at spots close to the ground, therefore should you notice
smell at such spots, do not fire up the burner.
- Assign an expert to operate the propane fueled burners.
- Check your boiler and pipes which the gas goes through for leaks at least once a
year.
CONTROL PANEL