INSTALLATION OF THE APPLIANCE
Keep the boiler in its package and on the pallet until the place it will be installed is
defined.
Leave the boiler to the place of installation defined before.
Open the package of the boiler on the pallet.
Remove the boiler from the pallet as in the order described below:
-
Lift the left side of the boiler and place its left foot.
-
Lift the other side of the boiler and place its right foot.
-
Slide the boiler to the back and place it securely.
Make sure you do not hit the ground or pallet with the boiler and do not drop the
boiler.
Check the foot levels of the boiler.
-
If necessary, adjust the levels of the feet.
-
Do not replace the feet completely.
MODEL
Minimum Ground Sizes
ECS 70
1080 X 960 X 200 mm
ECS 85
1080 X 960 X 200 mm
ECS 100
1080 X 1110 X 200 mm
ECS 150
1080 X 1400 X 200 mm
ECS 200
1210 X 1400 X 200 mm
ECS 250
1210 X 1530 X 200 mm
ECS 300
1210 X 1530 X 200 mm
ECS 350
1210 X 1710 X 200 mm
ECS 400
1460 X 1580 X 200 mm
ECS 500
1460 X 1920 X 200 mm
ECS 600
1510 X 1940 X 200 mm
ECS 700
1510 X 2110 X 200 mm
ECS 800
1610 X 2160 X 200 mm
ECS 900
1610 X 2400 X 200 mm
ECS 1000
1610 X 2560 X 200 mm