3.6 Connecting to a flue system
Flue gases should be taken off from the water heater to an individual chimney duct, by means of a pipe with external
diameter
117 mm (GE-19-02, GH-19-02), made of the material protected against corrosion.
External diameter
117 mm
Fig. 3.6.1. Installation dimensions (mm)
4 WATER HEATER OPERATION
4.1 Preparing the water heater for
the first start-up
Before proceeding with the first start-up of the water
heater, it is necessary to:
•
Fill the water system with water so as after turning on the
water taps water may flow. This ensures that the water
heater will be correctly filled with the water and it will be
operating properly.
•
Put on the gas flow knobs and the temperature selection
knobs
– push in the knobs drawing attention on their
position in relation to the inside knobs.
•
In water heaters GE-19-02
,
open the batterie compartment and insert a R20 batteries
drawing attention to its polarity. Next, close down the
compartment.