Recovery, Loading and Transporting
6
61/112
TL160
Operating Manual 12.9.08 Version 1.0
6.2
Loading the machine by use of a
crane
To load the machine by use of a crane, the following
preparations are required:
•
Empty the bucket and tip back.
•
Move the lift frame to travel position.
•
Apply the pin of the articulation lock (33/1 on the
articulation).
•
Lower the work tool onto the ground.
•
Switch off the engine.
•
Dismount from the machine and close the doors.
•
Attach the loader to the hoisting appliance at the
specified, marked points (Fig. 33) in the correct
manner.
6.3
Transport of the machine
To transport the machine onto a flat bed trailer,
railway goods wagon, etc. the following measures
must be taken:
•
Empty the bucket and tilt back.
•
Drive the machine onto the flat bed trailer, goods
wagon, etc., or lift by crane if required.
•
Apply the pin of the articulation lock (34/1 on the
articulation).
•
Lower the work tool onto the ground.
•
Switch off the engine.
•
Dismount from the machine and close the doors.
•
Attach the machine at the points illustrated
(Fig. 34) in the correct manner.
Fig. 33
Crane suspension
1
Danger to life
due to exceeding the maximum weight-lifting
capacity.
• Ensure that the maximum lifting capacity
of the crane and the crane harness is not
exceeded.
Fig. 34
Lashing for transport
1
Danger to life
due to disregarding the total transport height.
• It is essential to observe the clearance
heights of tunnels, bridges, etc.
Summary of Contents for TL160
Page 6: ...Index 6 112 TL160 Operating Manual 12 9 08 Version 1 0...
Page 12: ...12 112 TL160 Introduction 1 Operating Manual 12 9 08 Version 1 0...
Page 22: ...Safety and Accident Prevention 2 22 112 TL160 Operating Manual 12 9 08 Version 1 0...
Page 62: ...Recovery Loading and Transporting 6 62 112 TL160 Operating Manual 12 9 08 Version 1 0...
Page 104: ...Care and Maintenance 7 104 112 TL160 Operating Manual 12 9 08 Version 1 0...
Page 110: ...Appendix 9 110 112 TL160 Operating Manual 12 9 08 Version 1 0...
Page 114: ......