Primary Boom Components
34
Z
®
-45/25 • Z
®
-45/25J
Part No. 1312350GT
7 Tag and disconnect the hydraulic hoses from
the platform leveling slave cylinder at the
union and connect them together using a
connector. Connect the hoses from the
cylinder together using a connector.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
8 Tag, disconnect and plug the hydraulic hoses
from the jib boom/platform rotate manifold.
Cap the fittings on the manifold.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
9 Tag, disconnect and plug the platform rotator
hydraulic hoses at the union located above
the primary boom lift cylinder. Cap the fittings
on the unions.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
10 Tag, disconnect and plug the hydraulic hoses
from the platform leveling master cylinder.
Cap the fittings on the cylinder.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
11 Raise the boom to a horizontal position.
12 Place blocks between the upper and lower
cable tracks and secure the upper and lower
tracks together.
Crushing hazard. If the upper
and lower cable tracks are not
properly secured together, the
cable track could become
unbalanced and fall when
removed from the machine.
13 Attach a lifting strap from an overhead 5 ton /
5,000 kg capacity suitable device to the
platform end of the primary boom for support.
Do not lift it.
14 Remove all hose and cable clamps from the
underside of the primary boom.
15 Support the rod end of the primary boom lift
cylinder with a suitable lifting device.
16 Remove the pin retaining fasteners from the
primary boom lift cylinder rod-end pivot pin.
Do not remove the pin.
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 71: ...July 2021 Service and Repair Manual Manifolds Part No 1312350GT Z 45 25 Z 45 25J 59 ...
Page 73: ...July 2021 Service and Repair Manual Manifolds Part No 1312350GT Z 45 25 Z 45 25J 61 ...
Page 80: ...Service and Repair Manual July 2021 Manifolds 68 Z 45 25 Z 45 25J Part No 1312350GT ...
Page 83: ...July 2021 Service and Repair Manual Manifolds Part No 1312350GT Z 45 25 Z 45 25J 71 ...
Page 119: ...July 2021 Service and Repair Manual 107 Electrical Schematic Options ...
Page 123: ...July 2021 Service and Repair Manual 111 Wiring Diagram 2 2kW Hydraulic Generator ...
Page 125: ...July 2021 Service and Repair Manual 113 Electrical Schematic Kubota D1105 ...
Page 128: ...Service and Repair Manual July 2021 116 Functions Electrical Schematic ...
Page 129: ...July 2021 Service and Repair Manual 117 Electrical Schematic Deutz D2 9 ...
Page 132: ...Service and Repair Manual July 2021 120 Deutz D2 9 L4 Engine Wire Harness ...
Page 133: ...July 2021 Service and Repair Manual 121 Electrical Schematic Deutz 2011 L03i ...
Page 136: ...Service and Repair Manual July 2021 124 Electrical Schematic Deutz D436 1 ...
Page 137: ...July 2021 Service and Repair Manual 125 Electrical Schematic Deutz D436 2 ...
Page 139: ...July 2021 Service and Repair Manual 127 Hydraulic Schematic 2WD Models ...
Page 143: ......