Third Edition • First Printing
Operator's Manual
Inspections
Part No. 1315875GT
Z
®
-40N • Z
®
-40N RJ
31
Pre-operation Inspection
Be sure that the operator’s, safety, and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
Be sure that all decals are legible and in place.
See Inspections section.
Check for hydraulic oil leaks and proper oil
level. Add oil if needed. See Maintenance
section.
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed, or missing parts and
unauthorized modifications:
Electrical components, wiring, and
electrical cables
Hydraulic hoses, fittings, cylinders, and
manifolds
Hydraulic tank
Drive and turntable motors and drive hubs
Boom wear pads
Tires and wheels
Limit switches and horn
Alarms and beacons (if equipped)
Nuts, bolts and other fasteners
Platform entry mid-rail or gate
Lanyard anchorage points
Check entire machine for:
Cracks in welds or structural components
Dents or damage to machine
Excessive rust, corrosion or oxidation
Verify that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
Be sure that both battery packs are in place
and properly connected.
After you complete your inspection, be sure
that all compartment covers are in place and
latched.
Summary of Contents for Genie Z-40N
Page 62: ......