![Terex Genie BBSKETDL15B-1001 Operator'S Manual Download Page 24](http://html1.mh-extra.com/html/terex/genie-bbsketdl15b-1001/genie-bbsketdl15b-1001_operators-manual_1088832024.webp)
December 2015
24 SHOVEL - BUCKET - BASKET Part No.
57.0303.5251
First Edition - Second Printing
Operating Instructions
Operation
Loading Shovel
500L Loading Shovel 59.0201.9019 GT
800L Loading Shovel 59.0201.9020 GT
800L Loading Shovel 59.0201.9021 GT
800L Loading Shovel 59.0201.9022 GT
•
Couple the Shovel and hold it in position by means
of the attachment locking system (mechanical or
hydraulic)
.
•
Engage materials slowly
• To remove the attachment, remove the
attachment locking system (mechanical or
hydraulic) then carefully tilt the attachment
forward, lower the boom resting the attachment
on the ground and retract the boom.
Mixing Bucket
250L Mixing Bucket 59.0401.2018 GT
500L Mixing Bucket 59.0401.2016 GT
• Couple the Mixing Bucket and hold it in
position by means of the attachment locking
system (mechanical or hydraulic)
• Connect the Hydraulic hoselines
• To remove the attachment, remove the
attachment locking system (mechanical or
hydraulic) then carefully tilt the attachment
forward, lower the boom resting the attachment
on the ground, disconnect the Hydraulic
hoselines, and retract the boom.
Once the attachment quick connectors have
been disconnected from the boom connectors,
take care to reconnect them to the proper rest
connectors that are present on the Mixing
Bucket, in order to prevent impurities from
entering the circuit. Carefully protect the rest
connectors with the provided plugs when they
are not used.
Brick-Holder Basket
Brick-Holder Basket 59.0401.2032 GT
• Couple the Brick-Holder Basket by the forks
slots.
• Using the chain and shackle, secure the
attachment to the Forks carriage.
• To remove the attachment rest the attachment
on the ground, remove the chain and shackle,
then reract the boom.
Concrete Bucket
500L Man. Concrete Bucket 59.0401.2028 GT
500L Hyd. Concrete Bucket 59.0401.2029 GT
800L Man. Concrete Bucket 59.0401.2030 GT
800L Hyd. Concrete Bucket 59.0401.2031 GT
• Couple the Concrete Bucket by the forks slots.
• Using the chain and shackle, secure the
attachment to the Fork carriage.
• Connect the Hydraulic hoselines.
• To remove the attachment, rest the
attachment on the ground, disconnect the
Hydraulic hoselines, remove the chain and
shackle, then retract the boom.
Load Limiting System control
panel
Refer to telehandler operator's manual.
Using The Load Chart
Refer to telehandler operator's manual