14 Remove the primary boom extend drive speed
limit switch (LS1) mounted on the side of the
primary boom at the pivot end. Do not
disconnect the wiring.
15 Attach a lifting strap from an overhead crane
to the pivot end of the primary boom.
16 Carefully lift the secondary and primary boom
assembly with the overhead crane until the
master cylinder and primary boom lift cylinder
hydraulic hoses are accessible.
17 Remove the cable covers from the top of the
upper secondary boom.
18 Tag, disconnect and plug the primary boom lift
cylinder and master cylinder hydraulic hoses.
Cap the fittings on the cylinders.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
19 Lower the secondary boom to the fully stowed
position.
20 Pull all the cables and hoses through the
upper pivot.
Component damage hazard.
Hoses and cables can be
damaged if they are kinked or
pinched.
21 Position a lifting strap from the overhead crane
approximately 2 feet / 60 cm from the platform
end of the primary boom. Measure from the
platform end of the primary boom tube.
22 Remove the pin retaining fasteners from the
upper pivot to upper secondary compression
arm pivot pins. Use a soft metal drift to remove
the pins.
23 Swing the compression arms down and out of
the way. Secure them from moving.
24 Remove the pin retaining fasteners from the
upper pivot to the upper secondary boom pivot
pin. Use a soft metal drift to remove the pin.
25 Carefully remove the entire primary boom
assembly from the machine (primary boom
assembly, jib boom assembly, platform,
master cylinder, primary lift cylinder and upper
pivot).
Crushing hazard. The primary
boom assembly could become
unbalanced and fall when
removed from the machine if not
properly supported by the
overhead crane. Do not remove
the assembly from the machine
until it is properly balanced.
Note: During removal, the overhead crane strap will
need to be adjusted for proper balancing.
26 Place the entire assembly onto a structure
capable of supporting it.
27 Remove the pin retaining fasteners from the
upper secondary compression arm pivot pins.
Do not remove the pins.
28 Position a lifting strap from an overhead crane
at the center of the control box side upper
secondary compression arm.
Summary of Contents for Genie 20N RJ
Page 83: ...September 2021 Service and Repair Manual 71 Power Cable Wiring Diagram ...
Page 86: ...Service and Repair Manual September 2021 74 Drive Contactor Panel Wiring Diagram ...
Page 87: ...September 2021 Service and Repair Manual 75 Manifold and Limit Switch Wiring Diagram ...
Page 90: ...Service and Repair Manual September 2021 78 LVI BCI Option Wiring Diagram ...
Page 91: ...September 2021 Service and Repair Manual 79 Charger Interlock Option ...
Page 94: ...Service and Repair Manual September 2021 82 CTE Option CE Models ...
Page 95: ...September 2021 Service and Repair Manual 83 Hydraulic Schematic ...
Page 117: ......