5 OPERATION
59
5.1 General Information................................ 61
5.2 Pre-Operation Safety Checklist........... 61
5.3 Starting Procedure .................................. 62
5.4 Surface Preservation............................... 63
5.5 Filling the Bucket ..................................... 63
5.6 Grading ........................................................ 64
5.7 Leveling ....................................................... 64
5.8 Loading........................................................ 65
5.9 Fastening Attachments.......................... 65
5.10 Unfastening Attachments .................. 66
5.11 Power Quick Attach .............................. 66
5.12 Operation on Inclines .......................... 67
5.13 Shut Down Procedure ......................... 67
5.14 Lift Arm Brace ......................................... 68
Page
Summary of Contents for DTM 00101 (standard)
Page 2: ......
Page 6: ...4...
Page 8: ...6...
Page 34: ...32...
Page 36: ...34...
Page 42: ...40...
Page 62: ...60...
Page 72: ...70...
Page 78: ...76...
Page 99: ...SERVICE LOG 97 Hours Service Performed Notes...
Page 100: ...SERVICE LOG 98 Hours Service Performed Notes...
Page 101: ...SERVICE LOG 99 Hours Service Performed Notes...
Page 102: ......