November 2008
Section 7 - Repair Procedures
REPAIR
PROCEDURES
Document 57.0009.0427
3
GTH-4017EX GTH-4514EX GTH-4013 EX
Job Operators
Expected
needed time
(h)
change the boom anchoring pin
2
1,00 cad.
change the attachment locking cylinder pins
1
0,30
change the outrigger cylinder pin
1
0,30
change a cab pushbutton
1
0,30
change and test the actuator pressure relief valve or the sliders
1
2,00
change and test the actuator safety valve
1
1,00
change one-way valve
1
0,30
change the maxi-fuses and search for troubles
1
0,30
bleed the braking system
2
0,30 cad.
change the return filter of the hydraulic oil tank
1
0,30
change the hydrostatic steering unit
1
1,30
change the flashing beacon
1
0,20
change the battery
1
0,30
change the exhaust pipe
1
0,30
change the mud-guard brackets
1
0,30
change the mud-guard
1
0,30
change the parking brake cord
1
0,30
change the steering wheel
1
0,30
dismantle the hydraulic oil tank
2
2,00 cad.
dismantle the fuel tank
2
2,00 cad.
change a wheel (n° 1)
1
0,30
change the rear axle locking cylinder
1
1,00
change the outriggers
1
1,00
change flexible hoses
1
0,30
change the parking brake lever
1
0,30