MI-TZSTC-17L Rev_14/09/2015
13
STEP
#3
A
~
D
RILL FOUR
¼’’
HOLES IN THE WALL AT THE REQUIRED HEIGHT FOR EACH SHOWER COLUMN
SUPPORT AND INSERT THE WALL ANCHORS PROVIDED IN THE ASSEMBLY KIT
.
B
~
P
LACE THE SHOWER COLUMN SUPPORT AND USE A SCREWDRIVER TO TIGHTEN THE SCREWS
PROVIDED IN THE ASSEMBLY KIT
.
P
ULL ON EACH SUPPORT TO MAKE SURE IT IS PROPERLY FIXED
.
ÉTAPE
#3
A
~
P
ERCER QUATRE TROUS DE
¼’’
DANS LE MUR À LA HAUTEUR INDIQUÉE POUR CHAQUE
SUPPORT DE COLONNE DE DOUCHE ET INSÉRER LES ANCRAGES MURAUX FOURNIS DANS LA
TROUSSE D
’
ASSEMBLAGE
.
B
~
P
LACER LE SUPPORT DE COLONNE DE DOUCHE ET UTILISER UN TOURNEVIS AFIN DE SERRER
LES VIS FOURNIES DANS LA TROUSSE D
’
ASSEMBLAGE
.
T
IRER SUR CHAQUE SUPPORT AFIN DE
S
’
ASSURER QUE L
’
INSTALLATION EST ADÉQUATE
.
MI-TZSTC-17L Rev_14/09/2015
14
STEP
#4
A
~
P
LACE THE TOP SECTION OF THE SHOWER COLUMN ON THE MAIN SECTION USING THE FOUR
SCREWS AND NUTS PROVIDED IN THE ASSEMBLY KIT
.
B
~
A
TTACH THE SHOWER HEAD SUPPLY HOSE AND THE WATERFALL SUPPLY HOSE TO THEIR
RESPECTIVE COMPONENTS
.
E
NSURE THE GASKETS ARE PROPERLY PLACED
.
ÉTAPE
#4
A
~
P
LACER LA SECTION DU HAUT DE LA COLONNE DE DOUCHE SUR LA SECTION PRINCIPALE À
L
’
AIDE DES QUATRE VIS ET ÉCROUS FOURNIS DANS LA TROUSSE D
’
ASSEMBLAGE
.
B
~
V
ISSER LE BOYAU D
’
ALIMENTATION DE LA TÊTE DE PLUIE ET LE BOYAU D
’
ALIMENTATION DE
LA CASCADE AUX COMPOSANTS RESPECTIFS
.
S’
ASSURER QUE LES JOINTS D
’
ÉTANCHÉITÉ SOIENT
BIEN EN PLACE
.