background image

• Fold to center

• Fold those halves

   to center

• Roll tightly

• Fold one 

   side over

Folding Canopy:

• Release handle, crank until slot is

   pointing up

• Close handle

• Pass strap underneath and through

    the slot (as shown)

• While holding the whole strap 

   assembly attach both ends 

   (eg. tent to stake)

• Remove slack, before tightening

• Push ‘release’— lift handle and 

   tighten ratchet

• Roll-up any excess strap, put under

   handle

• Close handle

10

1.) Undo ratchet strap assemblies/untie ropes 

2.) Unfasten spring buckle straps, under canopy 

3.) Remove leg poles, on one long side 

      (use tent jacks for larger tents)

4.) Remove adjacent center, leg poles, on short sides

5.) Lower first long side to the ground

6.) Repeat, remove leg poles, on remaining 

      long side

7.)  Lower rest of frame to ground

8.) Lay tarp next to a long side of frame

9.) Loosen canopy corners

10.) Slowly slide canopy off frame— 

       flapping, in unison, as you go

10.) Fold and bag canopy (dry canopy)  

11.) Disassemble poles and connectors

12.) Remove ground stakes

STRIKE PROCEDURE 

(basically, reverse order from assembly)

USING RATCHET STRAPS

Release

(push, to lift handle 

and to remove strap, 

during disassembly)

Handle

Axle/Slot

(Ratchet Buckle Components)

716 832-TENT

 (

8368

)

Summary of Contents for West Coast Frame Tent 10'x'10

Page 1: ...Assembly Instructions WEST COAST FRAME TENT 20 x40...

Page 2: ...et up It s worth pointing out fewer parts means less load less to assemble faster set up and faster strike time For investment purposes the frames are expandable With the purchase of extra parts you c...

Page 3: ...se black Plates Corner Fittings Side Tee Fittings 6 Way Crowns 8 Way Crowns Ridge Crowns Crowns Rope 12ft w loop R Pins Single Head Stakes 3 4 x 30 Canopy Top SKU BT 38ROPE 12L SKU WCF CORNER SKU BT W...

Page 4: ...ditions with the installation instruction guidelines The customer is responsible to anticipate weather severity for proper time and method of construction BEFORE YOU DIG hammer stakes By Law you are r...

Page 5: ...up insert the second R pin all the way until it locks in place Reminder Frame plans and connector positions for your tent appear in the appendix 2 Connect the ridge line next 15x30 or larger crowns a...

Page 6: ...elevated STEP 6 ANCHOR ROPES STEP 5 COMPLETED FRAME Once again while frame is still on the ground lay down a tarp s to protect canopy arrange canopy along one of the long sides of the tent Place a lad...

Page 7: ...smaller tents 6 Remember base plates should be attached rst Velcro corners together After canopy is pulled over frame and and corners are pulled into position velcro corner seams together loosely tigh...

Page 8: ...is vertical and all the leg poles are attached begin the process of staking the tent with plenty of hands on deck lift and adjust tent position if needed rst Measure 4 ft out from each leg pole and p...

Page 9: ...nd tied o FIGURE C CLOVE HITCH KNOT Anchor Ropes should be tight One rope per leg pole Position corner straps straight o corner pole As the assembly nears completion it is time to tighten all ropes ra...

Page 10: ...necessary 10in behind primary stake see gure D search web for tent IFAI tent staking handbook for detailed information When SEVERE WEATHER is approaching the TENT SHOULD BE EVACUATED and TAKEN DOWN P...

Page 11: ...e straps under canopy 3 Remove leg poles on one long side use tent jacks for larger tents 4 Remove adjacent center leg poles on short sides 5 Lower rst long side to the ground 6 Repeat remove leg pole...

Page 12: ...ions Refer to page 1 for basic spreader and rafter layout corner tting Plans showing tent sizes leg pole and connector quantity and locations 9 4 W 9 4 W 10 6 G 10 6 G 1 4 4 R ridge crown 6 way crown...

Reviews: