background image

3

888 322-5606 (toll free)

• Plug the blower power cord into the GFCI 

   extension, then plug the GFCI extension 

   into the extension cord—connect the 

   fan cone to the inflation tube 

• Two inflation tubes used for this game 

• Close off the unused inflation tubes 

• Plug the extension cord into the power 

   source  

• Check the inflation tube to make sure it 

   is properly attached to the blower fan 

   —the inflation tube must be properly 

   closed around the blower outlet cone 

   to prevent large air leakage

• Close all zipper vents (if applicable)

• Locate the on/off switch (if applicable) 

   on the blower and turn it on—observe 

   the inflation of the inflatable as it rises

 • When inflation is almost finished, check

   the positioning of the stakes—hammer 

   them all the way in— see (

step 5

)

• Note: For medium soil conditions, larger 

   stakes will increase pullout capacity*

• Once inflated, check for any rips, holes, 

   or damage 

• When properly inflated, all inflated 

   areas of the game will become 

   pressurized and firm

Important: Keep blower on, 

continuously, for the duration of your 

event— to maintain proper inflation 

SET-UP STEP 5. (PROPER STAKING)

Hammer all the 

way in— hook

end should be 

touching the 

ground

Slide stake through 

D-ring and position 

hook away from 

inflatable

SOIL CONSISTENCY:

Stake in Hard, Stiff or Medium soil

DO NOT Stake in Soft soil

(check ASTM f2374-17 standards)

Slide feet first only!

Do not slide head first!

CORRECT!

One at a time!

No double sliding!

ARMS CROSSED,

FEET TOGETHER

Do not touch sides 

with hands or feet, 

all the way down

SET-UP STEP 4. (INFLATION TUBES)

The following instructions must be read 

and adhered to by all operator/attendants 

regarding this inflatable device:

• Trained attendants should be positioned 

   at the entrance and exit of device

• Attendants must be at least 18 years old

• Trained operator/attendants should assist 

   the movement of all child patrons as they 

   enter and exit the amusement device

• Attendants should remove all debris from 

   the inflatable prior to allowing persons 

   to enter or climb on inflatable 

• Trained attendants should only allow 

   persons of the same size and age on the 

   inflatable device at the same time— 

   

(check capacity on device warning label)

 

OPERATING INSTRUCTIONS

Twist tube

twice

Fold

Wrap both

sides and

secure tightly,

around tube

Wrap one

side and secure 

tightly

1.

2.

3.

Unused Inflation Tube

Inflation Tube

Anchor straps should be 

fully extended, away 

from unit

(FOR INFLATABLES WITH A SLIDE)

Summary of Contents for GA Bounce Kaleidoscope Castle 7013

Page 1: ...l free Instruction Manual INFLATABLE AMUSEMENT DEVICE BOUNCE HOUSES GENERAL INSTRUCTIONS RC 7013 GA Bounce Kaleidoscope Castle 1612NBroadStreet 44WRidgePike Lansdale Pa 19446 Limerick Pa 19468 215 362 7368 610 489 2334 ...

Page 2: ...UP STEP 1 SAFETY CHECK LIST 1 Use Ground Cover Tarps to protect inflatable Secondary escape opening in roof Must be positioned on a FLAT LEVEL SURFACE Anchor Straps at base secure with recommended stakes refer to your state inspection requirements 2 trained operator attendants are required to supervise this device at all times GFCI extension required reduces possibility of shock Commercial Inflatabl...

Page 3: ...hammer ground tarp hand truck or 4 wheel dolly crowbar stake remover safety goggles GFCI extension adapter 50 12AWG extension cord Carefully place unit using dolly at one end of tarp it s easier to move at this stage See drawing find back end of inflatable device and roll onto tarp Make a mental note or snap a picture of how the inflatable is folded and positioned as you unroll the game This will be ...

Page 4: ...the way in hook end should be touching the ground Slide stake through D ring and position hook away from inflatable SOIL CONSISTENCY Stake in Hard Stiff or Medium soil DO NOT Stake in Soft soil check ASTM f2374 17 standards Slide feet first only Do not slide head first CORRECT One at a time No double sliding ARMS CROSSED FEET TOGETHER Do not touch sides with hands or feet all the way down SET UP STEP ...

Page 5: ...sement device and at least 5 feet away from the sides Starting line is 48 inches from the entry of the inflatable amusement device Prohibit excessive rough play by occupants blow whistle In times of excessive heat monitor the heat inside play area and slide surface Do not allow any individual in the rear of the game or near the electric blower at any time Deny entry if any patron poses a risk to ot...

Page 6: ...cond inflation deflation tube strap and pull tube away from inflatable Open all deflation flaps While the inflatable amusement device is deflating remove stakes put blower fan away and store extension cord s Two people minimum needed to fold Guide inflatable inward and to the front while the air is being released Begin folding inflatable amusement device pull vertical peaks shapes toward the front to flatte...

Page 7: ...tight slip knot around the roll Stand the inflatable amusement device on end place the transport storage bag over one end of the game and work it down as far as you can It is important that you work the bag down to the top of the roll flip the unit and pull the bag up over the top of the inflatable amusement device Tie the bag closed Lay the game onto a dolly and roll it to your designated storage ar...

Page 8: ... EVACUATION PLAN In the case of rapid deflation or poor weather during operation attendants should follow these steps Operator attendants should blow whistles to evacuate patrons immediately and safely aid child patrons as they exit then tell them to step away from inflatable device Any patrons on elevated platforms should climb down the stairs backwards if a patron is sitting ready to slide let tha...

Page 9: ...S 14 x 12 5 x 15 5 INFLATION DEFLATION TUBES 2 DEFLATION FLAPS 1 DEVICE CAPACITY 6 Patrons BLOWER 1 1 0 HP MINIMUM NUMBER OF TRAINED ATTENDANTS 2 MINIMUM HEIGHT MAXIMUM HEIGHT 36 in 60 in ANCHORS TIE DOWNS 4 0 MAXIMUM WEIGHT 250 lbs per patron 600 lbs total limit SKU XBH RNBWMOD 14A 4 anchor straps 1 on each corner entrance exit 15 1 2 5 14 8 ...

Page 10: ...epair until you can apply the Single Patch Method or send the unit to a repair facility DAILY CHECKLIST Ensure maximum winds are less than the manufacturer s recommended wind speed requirement for unit Ensure temperatures are greater than 40 F Ensure that a minimum 12 gauge 3 wire extension cord is used with the blower and is connected to a CFCI Ground Fault Circuit Interrupter Ensure there are no...

Page 11: ...NIT REQUIRES A CONSTANT SOURCE OF 110V 20amp POWER PER BLOWER SYSTEM SAFETY RULES A MINIMUM OF TRAINED OPERATOR S MUST BE ON DUTY AT ALL TIMES ADULT SUPERVISION REQUIRED AT ALL TIMES Compliance Statement The vinyl and netting material used in the construction of this product is of the highest quality 100 lead free adheres to MFR methods and was built to ASTM F2374 standards NO SHOES NO UNEVENLY MA...

Reviews: