background image

ASSEMBLY OF ARCHIVE SHELVING

Tools Needed:

 A rubber mallet for seating the shelf supports into the uprights.  

Two people are recommended for assembly. Approximate assembly time: 20-30 minutes per section.

4.

 

Repeat the instructions in step 3 to construct a second set  

 

of unit ends.

2.

 

Depending upon whether you ordered a single unit or an   

 

adder unit, you may have one or both of the styles of upright  

 

shown. A single unit will use EUR posts for all four uprights,  

 

as show below in Figure A. If you plan on installing an adder  

 

unit, you should build your starter unit with two ZTP posts  

 

on one end which will join with the adder as shown in Figure B.

1.

 

The reference numbers used throughout this sheet refer to  

 

the illustration on the back cover. This is to help you to 

 

 

identify the various parts as they are mentioned.

3.

 

With the help from an associate, or using a wall for support,  

 

connect two EUR uprights (Ref. No. 1) using two front-to-   

 

back supports (Ref. No. 3), one at the top and one near the  

 

bottom (leaving the bottom-most keyhole slot empty). Be   

 

sure the front-to-back supports are fully seated in the  

 

 

keyhole slots as shown.

5.

 

With the help of an associate, connect the two unit ends    

 

with left-to-right shelf supports (Ref. No. 4). Again, be sure  

 

that the flat surface of the shelf support is facing up, and   

 

that the shelf supports are fully seated, as was illustrated in  

 

step 3.

EUR

Inset is shown from 

opposite side.

 

NOTE: The uprights must be positioned so that the  

 

narrow part of the slots is toward the floor, as shown.

ZTP

Figure A

Figure B

IMPORTANT: Support MUST 
be inserted so the flat 

surface is on top as shown 

in profile at left.

NOTE: If you are planning to install an adder unit, 
this second set of uprights should consist of ZTP 
uprights (Ref. No. 2) so that adjacent sections can 
be tied together. Carefully review step 2 and step 9 
to better understand.







Summary of Contents for Z-Line Record Archive Shelving

Page 1: ...thorized by Seller where goods are damaged during shipment or where the date stamps on the goods have been defaced modified or removed UNLESS CONSIDERED UNENFORCEABLE OR UNLAWFUL UNDER APPLICABLE LAW a ALL IMPLIED WARRANTIES INCLUDING BUT NOT LIMITED TO WARRANTIES OR MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY EXCLUDED b BUYERS REMEDY IF ANY FOR ANY DEFECTIVE GOODS SHALL BE LIM...

Page 2: ...e help from an associate or using a wall for support connect two EUR uprights Ref No 1 using two front to back supports Ref No 3 one at the top and one near the bottom leaving the bottom most keyhole slot empty Be sure the front to back supports are fully seated in the keyhole slots as shown 5 With the help of an associate connect the two unit ends with left to right shelf supports Ref No 4 Again ...

Page 3: ...Attach shelf deck supports by inserting the metal prongs on the deck support into the slots on the shelf supports 69 x 30 units require two shelf deck supports per level as shown 42 x 30 units require only one shelf deck support per level place in the center 6 Attach the remaining shelf supports at the desired shelf levels making sure that all shelf supports are completely seated in the upright sl...

Page 4: ... 49B199 PART NO PART NO Angle Post single or starter units only OR T Post adder units only OR Front to Back End Support OR Left to Right Shelf Support OR Shelf Deck Support Optional Particleboard Decking OR OR OR 4 2 6 6 3 EUR 60 EUR 84 ZTP 60 ZTP 84 VDRS 1516 VDRS 3016 VDRS 4216 VDRS 6914 FBSV 30 PB 4215 PB 4230 PB 6915 PB 6930 1 2 3 4 5 6 42w 42w x 15d x 15d 42w 42w x 30d x 30d 69w 69w x 15d x 1...

Reviews: