ASSEMBLY OF ARCHIVE SHELVING
Tools Needed:
A rubber mallet for seating the shelf supports into the uprights.
Two people are recommended for assembly. Approximate assembly time: 20-30 minutes per section.
4.
Repeat the instructions in step 3 to construct a second set
of unit ends.
2.
Depending upon whether you ordered a single unit or an
adder unit, you may have one or both of the styles of upright
shown. A single unit will use EUR posts for all four uprights,
as show below in Figure A. If you plan on installing an adder
unit, you should build your starter unit with two ZTP posts
on one end which will join with the adder as shown in Figure B.
1.
The reference numbers used throughout this sheet refer to
the illustration on the back cover. This is to help you to
identify the various parts as they are mentioned.
3.
With the help from an associate, or using a wall for support,
connect two EUR uprights (Ref. No. 1) using two front-to-
back supports (Ref. No. 3), one at the top and one near the
bottom (leaving the bottom-most keyhole slot empty). Be
sure the front-to-back supports are fully seated in the
keyhole slots as shown.
5.
With the help of an associate, connect the two unit ends
with left-to-right shelf supports (Ref. No. 4). Again, be sure
that the flat surface of the shelf support is facing up, and
that the shelf supports are fully seated, as was illustrated in
step 3.
EUR
Inset is shown from
opposite side.
NOTE: The uprights must be positioned so that the
narrow part of the slots is toward the floor, as shown.
ZTP
Figure A
Figure B
IMPORTANT: Support MUST
be inserted so the flat
surface is on top as shown
in profile at left.
NOTE: If you are planning to install an adder unit,
this second set of uprights should consist of ZTP
uprights (Ref. No. 2) so that adjacent sections can
be tied together. Carefully review step 2 and step 9
to better understand.