background image

G

E

NE
RA
L

IN

S

TA

LL

A

TIO

N

OPA 465–960 RKTG-P (ECO)

Air Cooled Packaged Units - Reverse Cycle - R410A

Installation & Maintenance

1. GENERAL

Temperzone OPA Outdoor Air Cooled Packaged units.
Follow these instructions to ensure the optimum 

performance, reliability and durability.
Units must be installed in accordance with all national and 

regional regulations and bylaws. National Health and Safety 

regulations must be followed to avoid personal injuries.

The appropriate local permits must be acquired and  

adhered to.
Local regulations on maximum boundary noise need to  

be considered when positioning the unit.

2. INSTALLATION

Refer to dimension diagrams below for minimum clearances. 

If multiple units are to be placed side-by-side then allow at 

least 2m between coil faces. (refer fig. 1)

2.1 Mounting

The unit should be fastened to a firm flat horizontal 

base using the holes supplied in the mounting 

channels. When the unit is being installed on a roof it is 

recommended that the unit is installed on a substantial 

structure with vibration isolating springs beneath the 

unit. These springs are not supplied with the unit.
Flexible duct connections are recommended between 

the supply and return ducts and the unit.
Unit is shipped with wooden blocks installed under the 

compressors.  Ensure these blocks are removed from  

the compressor feet prior to starting the unit  

(not required for operation).

Factory filter slides are fitted, access to the filter access 

door should be considered when designing return 

and supply air ductwork.  Access to the filters can still 

be achieved by removing the return air access door, 

however it is imperative that the rubber insulating 

washers be refitted to the screws prior to replacing  

the panel.

2.2  Condensate Drain

The condensate drain should be ‘U’ trapped outside the 

unit. The trap should have a vertical height of at least 

100 mm. The drain should have a slope of at least 1 in 

50 and must not be piped to a level above the unit drain 

pipe. (refer fig. 2)

Figure 1.

OPEN

DRAIN

MINIMUM

SLOPE

20 mm PER m

(1 IN 50)

100 mm

MINIMUM

200 mm

APPROX.

'U' TRAP

100 mm

APPROX.

VENT PIPE

FOR LONG

CONDENSATE

DRAIN RUNS

Figure 2.

SUPPLY

AIR

RETURN

AIR

OUTDOOR

AIR FLOW

OUTDOOR

AIR FLOW

OPTIONAL

WEATHER

HOOD

1000 MIN

. CLEARANCE

500 MIN. CLEARANCE

ELECTRICAL

ACCESS

PANEL

1000 MIN.

CLEARANCE

FOR FILTER

ACCESS

500 MIN. CLEARANCE

2000 MIN. CLEARANCE

1000 MIN. CLEARANCE

FAN 

ACCESS

PANEL

Summary of Contents for OPA 465RKTG-P

Page 1: ...supplied with the unit Flexible duct connections are recommended between the supply and return ducts and the unit Unit is shipped with wooden blocks installed under the compressors Ensure these blocks are removed from the compressor feet prior to starting the unit not required for operation Factory filter slides are fitted access to the filter access door should be considered when designing return...

Page 2: ...stribution board by means of a circuit breaker or H R C fuse and a mains isolator provided preferably close to the unit Note DO NOT USE REWIRABLE FUSES The OPA ECO is provided with a 24VAC control circuit thermostat TZT Optional on off switch and or time clock field supplied and fitted The control transformer 240V primary is used for countries with 230 240V power supply Alternatively control can b...

Page 3: ...f all electrical connections and sign the check label 10 Touch up any outdoor unit paintwork damage to prevent corrosion 5 3 Commissioning EC Plug Fans Six Keys service interface function description 1 Alarm Press Alarm button to access alarm operation a View the active alarm b Logger alarm data 2 Prg Press program button enter to main menu 3 Esc Return to menu s previous level 4 Enter Press the E...

Page 4: ...e system has an adequate amount of refrigerant Signals used for this check are mid coil temperatures TS1 TS2 suction temperatures ST1 ST2 and discharge line pressures HP1 and HP2 if present The check is not made during the first 5 minutes after a compressor is started to allow pressures and temperatures to settle If the compressor is a variable speed type or a digital scroll type then the check is...

Page 5: ... communications port then an alarm is generated Examples of such devices are a TZT 100 thermostat a Carel Power inverter Display indication for communications fault letter C flashing 7 TEST MODE Test mode can only be activated when both compressors are OFF To start test mode press and hold down the push button on the lower board between 1 and 5 seconds In test mode each output is activated for 5 t...

Page 6: ...00 200 300 AIR FLOW l s AVAILABLE EXTERNAL PRESSURE Pa 2 5 m s Face Velocity 400 500 2500 NOMINAL 9V 8V 7V 5V 6V 4 0 2 0 1 2 0 8 4 6 4 0 0 6 2 6 1 5 0 8 1500 2000 2500 3000 3500 4000 0 100 200 300 AIR FLOW l s AVAILABLE EXTERNAL PRESSURE Pa 2 5 m s Face Velocity 400 Nominal 500 8V 7V 9V 10V 6V 2 3 1 5 1 0 3 5 2 5 1 1 3 4 0 6 0 7 1 7 3000 3500 4000 4500 5000 0 100 200 300 AIR FLOW l s AVAILABLE EXT...

Page 7: ...If on the other hand a TZT with Modbus is used the installing contractor will see the label and wires and then wire them to the 24 volt terminals RS485 Terminal on UC6 Lower Board Connections Serial Card BMS TZT Controller Installation If a TZT100 controller is used in Modbus format these cables should be wired to the following terminals on the low voltage input terminal strip 24V Hot terminal to ...

Page 8: ...Check system operating pressures and history using PDG mini service interface tool fitted to all ECO machines 12 2 Three Monthly or every 1200 hrs of operation Check the indoor unit s indoor EC motor and plug fan operation and adjust if necessary using PDG mini service interface tool fitted to all ECO machines 12 3 Six Monthly 1 Check the tightness of electrical connections 2 Check the tightness o...

Page 9: ...nditioning heat hump unit seems to work properly Many new buildings especially a commercial buildings have a large amount of concrete and other structural materials that are generally cold and full of moisture This is most evident in the winter when trying to heat the building from scratch 13 5 Unit is leaking water Check the drain trap vent slope before moving on to Water carry over Reduce the ma...

Page 10: ... 10 OPA 465RKTG P ...

Page 11: ... 11 OPA 550RKTG P ...

Page 12: ... 12 OPA 705RKTG P ...

Page 13: ... 13 OPA 800RKTG P ...

Page 14: ... 14 OPA 855RKTG P ...

Page 15: ...OPA 960RKTG P ...

Page 16: ...uritius Bangalore Bangkok Hanoi Cambodia South Pacific Islands Bangladesh temperzone australia pty ltd Head Office Sydney 14 Carnegie Place Blacktown PO Box 6448 Delivery Centre Blacktown NSW 2148 Australia Email sales temperzone com au www temperzone biz Sydney 02 8822 5700 Brisbane 07 3308 8333 Melbourne 03 8769 7600 Adelaide 08 8115 2111 Perth 08 6399 5900 Townsville 07 4774 3506 Launceston 03 ...

Reviews: