17
Temco DV5200, DV6400 Series
77531
9. Using the high temperature sealant provided, apply
a small bead of sealant to both the flue and inlet
pipe extensions on the vent terminal (cap) and
install the horizontal vent terminal to side of building
with four (4) screws provided.
10. If the last section of vent pipe does not allow the
vent terminal to seat against the outside wall, it will
be necessary to replace the last vent section with a
shorter vent section. In addition, you may also
measure the distance between the wall and back
flanges of the terminal base plate. Next, trim off the
terminal flue and inlet pipes to the dimension mea-
sured and reinstall the vent terminal.
ATTENTION: Vent terminal flue and inlet pipes must
overlap last vent section a minimum of 1” (25mm).
If the horizontal termination is located in an accessible
area below 7” (178mm), an HTG guard is to be in-
stalled over terminal.
A Vinyl Extension Frame Kit No. VEF is required for all
installations where vinyl siding is used with the HFTK
Kit or HSQ47 Horizontal Vent Termination. If a Vinyl
Extension Frame Kit No. VEF is used, measure to
outside surface of wall without siding and add an
additional 2” (51mm) to the venting length.
A
A
A
Inlet Pipe
Wall Thimble
HSQ47
Vent
Terminal
Exterior Wall
Cut Lines
T197
Fig. 28 Cut the terminal flue and inlet pipes to shorten the
vent section.
The flue pipe and inlet pipe of the vent terminal
may be cut back equal amounts as illustrated by
Dimension “A”.
Push vent terminal in as
far as vent system will
allow. Use Dimension “A”
as the dimension needed
to trim off the terminal
flue and inlet pipe.