8. To finish connections, place a small bead of silicone
to the outside of the fireplace inlet flange. Then, slide
the extension collar over the inlet flange and secure
with the three (3) screws provided.
NOTE:
We recommend driving in two (2) sheet metal
screws at 180° adjacent to the gear clamp at each joint.
Flex Vent Through the Roof
(Vertical) Applications
All models are approved for:
1. Vertical venting up to 35’ (10.7 m) with 7” x 4” flex.
2. Multiple bends allowed. See section on General
Venting.
3. With each vertical installation, a VSK7MH-2 kit may
be used.
T190
ceiling install
12/5/03 djt
Room Above
Ceiling Level
Ceiling Joist
Firestop
T190
Fig. 23
Firestop at ceiling level.
T190
ceiling install
12/5/03 djt
Firestop
Attic Above Ceiling
(Uninsulated)
Attic Above Ceiling
(Insulated)
Attic Insulation
Shield
T190
Fig. 24
Attic insulation shield.
6' (1.8m)
Maximum
35' (10.7m)
Maximum
T191
thru the roof
installation
12/5/03 djt
Roof
Attic Insulation
Shield
7” (178 mm) Dia.
Joists
T191
Fig. 25
Typical through-the-roof installation.
The VSK7MH-2 Kit contains:
• Vertical Termination Cap and Storm Collar
• 4”/7” dia. x 24” Rigid Pipe (unitized)
• 7” dia. Roof Support Components
• 10’ Length of 4” x 7” Aluminum Flex Vent w/Clamps
• Adjustable Firestop Thimble Assembly
• 0/12-5/12 Flashing with Storm Collar
• Tube High Temp Sealant
• 7” dia. Inlet Ext. Collar
• Firestop
• Hardware Pack
• Instruction
VSK7MH-2 Vertical Flex
Vent Kit Installation
1. Locate the fireplace.
2. Mark ceiling above unit where flex will come through.
*-REFER TO VERTICAL TERMINATION LOCATION
CHART
3. Ceiling opening should be a minimum of 9
¹⁄₂
” x 9
¹⁄₂
”
(241 x 241 mm) and framed to that size.
4. Mark opening in roof and cut a hole minimum 9
¹⁄₂
” x
9
¹⁄₂
” (241 x 241 mm) and frame to that size.
5. Place fireplace in proper location and secure to the
floor.
6. Install the firestop thimble assembly at the ceiling
level.