ONT248 Description, Installation and Turnup Manual
Page 20 of 29
1.2. Site Preparation
Required Tools
The following tools are needed for the ONT248 Installation
·
Phillips head screw driver
·
4x Standard Rack Screws for mounting the ONT248 into standard 19" rack.
For proper installation to maximize uptime it is recommended that each AC Input should
be on a separate circuit so that if the circuit breaker trips due to a fault, that the other
power supply will continue to operate on its own circuit breaker.