OLCT 60
FIXED POINTGAS MONITOR
USER MANUAL
NPO60GB
Revision F.2
13
2.7.2
Opening of the detector
Loosen the 4mm hex screw (rep.1) locking the cover before removing the detector cover.
Figure 16: Locking screw of the cover
2.7.3
Cable preparation
The cable will be supplied from the controller at the measurement point. The passage, support,
and protection of the cable shall be done according to best practice.
2.7.4
Cable entry
It is essential to follow the instructions given by the manufacturer of the cable gland
and to connect the shielding properly. Cable-gland or adaptor shall be M25 x 1.5
and flameproof certified.
Figure 17: non-armoured cable gland type
Figure 18: armoured cable gland type
Non-armoured cable
Washer
Shielding
Seal
Detector
Shield
Cable clamp
Detector
Seal
Armour grounding
Armoured cable
Seal
Summary of Contents for OLCT 60
Page 1: ...NPO60GB Revision F 2 OLCT 60 FIXED POINTGAS MONITOR USER MANUAL ...
Page 44: ...OLCT 60 FIXED POINTGAS MONITOR USER MANUAL 38 NPO60GB Revision F 2 ...
Page 50: ...OLCT 60 FIXED POINTGAS MONITOR USER MANUAL 44 NPO60GB Revision F 2 ...
Page 52: ...OLCT 60 FIXED POINTGAS MONITOR USER MANUAL 46 NPO60GB Revision F 2 ...
Page 66: ...OLCT 60 FIXED POINTGAS MONITOR USER MANUAL 60 NPO60GB Revision F 2 ...
Page 67: ...OLCT 60 FIXED POINTGAS MONITOR USER MANUAL NPO60GB Revision F 2 61 ...