3 Installation
Model 3010TB
3-12: Part I
Teledyne Analytical Instruments
3.4
Testing the System
After
The Control Unit and the Analysis Unit are
both
installed and
interconnected, and the system gas and electrical connections are complete,
the system is ready to test.
Before
plugging either of the units into their
respective power sources:
•
Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.
•
Check the integrity and accuracy of all electrical connections.
Make sure there are no exposed conductors
•
Check that sample pressure is between 3 and 40 psig, according
to the requirements of your process.
Power up the system, and test it by performing the following
operations:
1. Repeat the Self-Diagnostic Test as described in chapter 4, section
4.3.5.
Summary of Contents for 3010TB
Page 8: ...viii Model 3010TB Teledyne Analytical Instruments...
Page 12: ...iv Part I Model 3010TB Oxygen Analyzer Teledyne Analytical Instruments...
Page 16: ...2 4 Part I 2 Operational Theory Model 3010TB Teledyne Analytical Instruments...
Page 58: ...iv Part II Model 3010TB Oxygen Analyzer Teledyne Analytical Instruments...
Page 62: ...1 4 Part II 1 Introduction Model 3010T Teledyne Analytical Instruments...
Page 98: ...A 10 Appendix Model 3010TB Teledyne Analytical Instruments...