
Thermal Conductivity Analyzer
Part II: Analysis Unit
Teledyne Analytical Instruments
Part II: 4-1
Maintenance
4.1
Routine Maintenance
Aside from normal cleaning and checking for leaks at the gas connec-
tions, routine maintenance is limited to recalibration.
Self-diagnostic testing of the system and fuse replacement in the Con-
trol Unit are covered in Part I, chapter 5 of this manual. For recalibration, see
Part I, section 4.4
Calibration
.
WARNING: SEE WARNINGS ON THE TITLE PAGE OF THIS
MANUAL.
4.2
Major Components
The internal components are accessed by rotating the explosion-proof
housing cover counterclockwise several turns until free. See Figure 4-1,
below.
WARNING: SEE WARNINGS ON THE TITLE PAGE OF THIS
MANUAL.
The 2010A Analysis Unit contains the following major components:
•
TC Cell
•
Optional Auto-Cal Solenoid Assy.
•
Heater Assembly
•
Electrical Connector Panel
•
Gas Connector Panel (external)
See the drawings in the Drawings section in back of this manual
for details
.
Summary of Contents for 2010A
Page 16: ...Teledyne Analytical Instruments 1 Part 1 Introduction Model 2010A ...
Page 22: ...2 6 Part I 2 Operational Theory Model 2010A Teledyne Analytical Instruments ...
Page 34: ...Teledyne Analytical Instruments 3 Installation Model 2010A 3 12 Part I ...
Page 70: ...5 Maintenance Model 2010A 5 6 Part I Teledyne Analytical Instruments ...
Page 86: ...1 4 Part II Teledyne Analytical Instruments 1 Introduction Model 2010A ...
Page 104: ...4 Maintenance Model 2010A 4 8 Part II Teledyne Analytical Instruments ...