1.4 Installation
NOTE:
Panel brackets are provided for flush or extended
mounting in an EIA or WECO rack.
Procedure steps:
1. If necessary, remove the three screws and reposition/
realign the brackets on the sides of the breaker panel,
as shown in Figure 2.
2. Locate an unused rack position and mount panel using 4
screws and star washers provided, as shown in Figure 3. (It’s
best to mount the panel as high as possible on the rack.)
Tighten the screws to 35 in.-lb (4.29 N•m).
WARNING
!
WARNING! Failure to properly ground this equipment can create hazardous conditions to
installation personnel and to the equipment.
3. Use a UL/NRTL-approved crimping tool to attach a UL/NRTL-approved, 2-hole compression
lug (fit M5 dual studs on
5
/
8
" centers) onto a #10 to #2 AWG ground wire. (Size of ground wire
depends on size of input BATT wires.)
4. Attach opposite end of ground wire to relay rack, per local practices.
Figure 2 - Bracket Orientation
Figure 3 - Rack Mounting