
- 8 -
GB
SPLIT
SPLIT
SPLIT
SPLIT
SPLIT
7000
3
TRANSPORT, HANDLING, STORAGE
3.1 Storage
During transport, the air conditioner is protected by
a suitable carton packaging. The air conditioner
must be stored in a horizontal position, in a covered,
dry and ventilated environment.
The package is made to allow up to five (5)
condensing parts and up to five (5) evaporating parts
to be stacked.
Do not turn the package upside
down. The right position is shown by the
symbol stamped on the package ( ).
Stacking a larger number of
items than the number specified above, com-
plete with their packaging, is dangerous not
only for the integrity of the equipment, but is
also hazardous for people.
3.2 Weight
Weight not including packaging.
SPLIT 7000
25 kg for the condensing part
9 kg for the evaporating part
3.3 Handling
The air conditioners, complete with their packaging,
can be handled using ordinary hoisting and transport
means.
The boxes are fitted with spacers which allow you
to introduce transpallet forks.
When hoisting and
transporting, comply with accident prevention
and safety rules. Use hoisting and transport
equipment with a capacity greater than the load
to be hoisted
4
INSTALLATION
4.1 Preliminary information
Before installing the air
conditioner, you must by all means read these
instructions in order not to make any mistake
while installing.
Improper installation of the air
conditioners may lead to irreparable damage to
the equipment and compromise the safety of
the user.
Should the air conditioners be installed in a manner
which does not comply with the instructions of this
manual, the Manufacturer shall not be held liable
for any failure or for the safety of the air conditioner,
according to the law DM 89/392/EEC. The
Manufacturer shall also not be liable, in such a case,
for any damage to things or injury to people.
The unit must be installed
according to the national installation standards
(for Italy, it must be exclusively installed by
qualified and specially trained personnel).
4.2 Installation
Before installing, you must cut
off all the power supply to the vehicle
Battery positive pole
Generator unit (if any)
Outside power source.
Failure to comply with the
above instructions may lead to electrical
discharge.
Before getting onto the roof of
the vehicle, make sure it is strong enough to be
walked on. Check with the provider of the
vehicle. Should it not be strong enough, you
must set up a special trestle with scaffolding.
Summary of Contents for ICEBERG SPLIT 7000
Page 21: ......
Page 22: ......
Page 23: ......
Page 29: ...Split 7000 kit tubes cables Tav 3 Vers 1 del 26 06 2003...
Page 33: ...33 GB SPLIT SPLIT SPLIT SPLIT SPLIT 7000 NOTES...
Page 34: ...34 GB SPLIT SPLIT SPLIT SPLIT SPLIT 7000 NOTES...
Page 35: ...35 GB SPLIT SPLIT SPLIT SPLIT SPLIT 7000 NOTES...