4.3 Positioning the air conditioner
Before positioning the air conditioner on the roof of
the vehicle, spread a sufficient of quantity slow-
drying sealant around the edges of the opening.
Take the air conditioner on to the roof of the vehi-
cle [Fig. 7 ref. 2] and position it over the opening
(previously treated with sealant). Remember that
the side with the ventilation grid must face the rear
end of the vehicle. The arrow on Figure 7 shows
the driving direction of the vehicle.
The support gasket must be
placed flush with the edge of the hole drilled,
on the back of the air-conditioning unit [fig. 7
ref. 1].
Do not crush the foam sealing
too much - it must be at least 10 mm thick
[Fig. 9 ref. 3].
If the lining is crushed too much, this will dam-
age the support of the air conditioner and will
compromise the watertightness of the junction.
From within the vehicle, move the air-conditioning
unit until the gasket is flush with the rear section
of the roof opening.
The air ducts may be extended,
[fig. 8], they may therefore be used with roof
thickness 30 to 80 mm. Should the roof be
thicker, longer air ducts are available.
Fix the anchor frame to the air conditioner [Fig. 9
ref. 1] , as shown on Figure 9, using the four rel-
evant screws [Fig. 9 ref. 2] without tightening them
all the way.
7
8
9
Summary of Contents for Iceberg 12000
Page 1: ...AIR CONDITIONER INSTALLATION AND USER MANUAL GB VERS 003 JULY 2005 ...
Page 20: ...IC12000 1 TAV ...
Page 23: ...2 TAV ...
Page 25: ...IC7000 1 TAV ...
Page 28: ...2 TAV ...
Page 31: ......