background image

Specifications

22

TMSSY2 mPGA479 Socket Hardware Support

Table 6: Environmental specifications (cont.)

Characteristic

1

Description

Minimum operating

0

°

C (+32

°

F)

Nonoperating

--55

°

C to +75

°

C (--67

°

F to +167

°

F)

Humidity

10 to 95% relative humidity, noncondensing

Altitude

Operating

3 km (10,000 ft) maximum

Nonoperating

15 km (50,000 ft) maximum

Electrostatic immunity

The probe adapter is static sensitive

1

Designed to meet Tektronix standard 062-2847-00 class 5.

2

Not to exceed

microprocessor

thermal considerations. Customer supplied cooling

might be required across the CPU.

Summary of Contents for TMSMPH4 mPGA479

Page 1: ...Instruction Manual TMSSY2 mPGA479 Socket Support Includes TMSMPH4 mPGA479 probe head installation instructions 071 1899 00 www tektronix com...

Page 2: ...nd pending Information in this publication supercedes that in all previously published material Specifications and price change privileges reserved TEKTRONIX and TEK are registered trademarks of Tektr...

Page 3: ...ations This warranty shall not apply to any defect failure or damage caused by improper use or improper or inadequate maintenance and care Tektronix shall not be obligated to furnish service under thi...

Page 4: ...under this warranty Customer must notify Tektronix of the defect before the expiration of the warranty period If Tektronix is unable to provide a replacement that is free from defects in materials and...

Page 5: ...AB1 Cables 3 Connect the Logic Analyzer to a SUT 5 Replaceable Parts List 9 Logic Analyzer Software Compatibility 10 Installing the Software 10 Support Package Setup 10 Maintenance and Shipping 11 Car...

Page 6: ...oad model for typical signals 18 Figure 10 Preprocessor load model for typical signals 18 Figure 11 Receiver topology A 19 Figure 12 Receiver topology B 19 Figure 13 Receiver topology C 19 Figure 14 E...

Page 7: ...re making connections to the input or output terminals of the product ensure that the product is properly grounded Observe All Terminal Ratings To avoid fire or shock hazard observe all ratings and ma...

Page 8: ...itions or practices that could result in damage to this product or other property These terms may appear on the product H DANGER indicates an injury hazard immediately accessible as you read the marki...

Page 9: ...roduct unless another person capable of rendering first aid and resuscitation is present Disconnect Power To avoid electric shock switch off the instrument power then disconnect the power cord from th...

Page 10: ...Service Safety Summary vi TMSSY2 mPGA479 Socket Hardware Support...

Page 11: ...icates that this product complies with the European Union s requirements according to Directive 2002 96 EC on waste electrical and electronic equipment WEEE For information about recycling options che...

Page 12: ...Environmental Considerations viii TMSSY2 mPGA479 Socket Hardware Support...

Page 13: ...he TMSMPH4 probe head that combine to make a probe adapter This manual is part of a set of information on how to operate this product on compatible Tektronix Logic Analyzers If you are familiar with o...

Page 14: ...Preface x TMSSY2 mPGA479 Socket Hardware Support...

Page 15: ...m the microprocessor based system flow through the probe adapter cables to the logic analyzer where the loaded support software disas sembles data acquired from the SUT The TMSSY2 support product incl...

Page 16: ...t of the Master module M A S T E R S L A V E 2 S L A V E 1 S L A V E 3 Figure 1 Master and Slave module configuration All signals are acquired through probes connected to the logic analyzer Use the lo...

Page 17: ...15 M A S T E R S L A V E 2 S L A V E 1 S L A V E 3 TMSCAB1 cables 5 P6960 probes 4 P6960 probes 2 Figure 2 Module configuration 1 From the Master module match the label on the TMSCAB1 cable with the c...

Page 18: ...rd surface and then snug each screw to 1 in lbs max Under tight ening the screws can result in intermittence Over tightening can result in damage to the elastomer holder and stripped screws 4 Match th...

Page 19: ...Table 1 lists airflow clearances for the preprocessor unit Table 1 Preprocessor airflow clearance Characteristic Description Required airflow clearances for the preprocessor Front top left side 5 08...

Page 20: ...tor located on the logic analyzer 3 Remove the heat sink and any retention brackets from the SUT CAUTION To prevent damage to the probe head and pins you must always handle the probe head carefully an...

Page 21: ...n 1 SUT Top bracket black Top bracket blue 1 2 3 Connect the probe head to the SUT and lock the ZIF socket on the SUT Insert bottom plate as shown 5 Heat sink attaching hardware Using the supplied scr...

Page 22: ...7 and 8 to remove the probe head 3 Store the probe head in the original packing material To apply power to the probe adapter and SUT follow these steps 1 Make sure the power switch on the preprocesso...

Page 23: ...Replaceable parts list Fig number page number Part number Quantity Description 3 4 TMSSY2 1 CIRCUIT BOARD ASSY PROBE HEAD BOARD W CABLES PADDLE BOARD TESTED 4 7 TMSMPH41 1 MICRO SUPPORT PROBE HEAD M 4...

Page 24: ...all the PUB32G15 software on the Tektronix logic analyzer follow these steps 1 Insert the CD in the CD drive 2 Follow the on screen instructions to install the software To remove or uninstall software...

Page 25: ...aminants When not in use store the probe adapter in the original shipping bags and cardboard carton Clean dirt and dust with a soft bristle brush For more extensive cleaning use only a damp cloth mois...

Page 26: ...AC power cord on the preprocessor unit It is not necessary to power off the logic analyzer 2 To remove the probe head reverse the probe installation instructions starting on page 7 that apply to your...

Page 27: ...preprocessor unit and cables in static shielding bags Figure 6 Preprocessor unit in static shielding bags 3 Place the foam in the bottom of the cardboard carton 4 Place the foam end caps on both side...

Page 28: ...accessory tray in the cardboard carton 9 Place the probe head in the black plastic storage case 10 Place the storage case in the accessory tray Figure 8 Probe head storage case 11 Close and tape the...

Page 29: ...repackaging instructions If the existing shipping carton is not available use a double walled corrugated cardboard shipping carton that allows a 3 inch 7 62 cm minimum on all sides of the product 2 I...

Page 30: ...Maintenance and Shipping 16 TMSSY2 mPGA479 Socket Hardware Support...

Page 31: ...type 4x Quad Pumped Signals These signals include D 63 00 and DBI 3 0 The ASIC latches these signals using their dedicated strobes STBP 3 0 and STBN 3 0 and then performs four way demultiplexing on th...

Page 32: ...75 1300 mils 213 ps 75 25 mils 4 6 ps 0 7 pF 0 7 pF 200 1 75 4 inches 477 ps 0 4 dB Preprocessor Model 75 1300 mils 213 ps 75 25 mils 4 6 ps 0 7 pF 0 7 pF 200 1 75 4 inches 477 ps 0 4 dB Preprocessor...

Page 33: ...9 Socket Hardware Support 19 0 2 450 fF 75 83 ps 100 5 ps 225 fF 75 0 8 V Figure 11 Receiver topology A 750 0 53 V 150 nH 75 750 150 nH 75 k Figure 12 Receiver topology B 750 150 nH 750 150 nH 75 k Fi...

Page 34: ...e probe adapter Table 5 on page 21 lists the BCLK timing and electrical specifications Table 6 on page 21 lists the environmental specifications Table 3 Electrical specifications for the SUT Character...

Page 35: ...RB Figure 14 Eye diagram Table 4 Electrical specifications for the AC input to the preprocessor unit Characteristic Description Input Voltage rating 100 240 VAC 10 CAT II Input Frequency rating 50 60...

Page 36: ...C 67 F to 167 F Humidity 10 to 95 relative humidity noncondensing Altitude Operating 3 km 10 000 ft maximum Nonoperating 15 km 50 000 ft maximum Electrostatic immunity The probe adapter is static sen...

Page 37: ...ons EN 61000 3 3 Voltage changes fluctuations and flicker Complies with EMC provision of Radiocommunications Act per these stan dard s H AS NZS 2064 1 2 Industrial Scientific and Medical Equipment 199...

Page 38: ...ey are rated H Pollution Degree 1 No pollution or only dry nonconductive pollution occurs Products in this category are generally encapsulated hermetically sealed or located in clean rooms H Pollution...

Page 39: ...voltage installation H Measurement Category III For measurements performed in the building installation H Measurement Category II For measurements performed on circuits directly connected to the low v...

Page 40: ...ware Support Figure 15 shows the dimensions of the probe head 52 78 mm 2 078 in Pin 1 63 14 mm 2 486 in 11 30 mm 0 445 in 10 52 mm 0 414 in 3 66 mm 0 144 in 4 55 mm 0 179 in Platform and socket Figure...

Page 41: ...CAUTION To prevent damage to the circuitry in the preprocessor unit you must observe the required clearances in Table 1 on page 5 clearances are not shown in Figure 16 160 27 mm 6 310 in 420 37 mm 16...

Page 42: ...Specifications 28 TMSSY2 mPGA479 Socket Hardware Support...

Page 43: ...SINGLE ENDED 34 CH HIGH DENSITY P69601 PREPROCESSOR CABLE ASSEMBLY W LABELS TMSCAB12 TMS131 MICRO SUPPORT IA32G15 SOFTWARE W HW SW MANUALS MICROPROCESSOR SUPPORT RUL 2 063 3927 XX3 A0 US POWER CORD ST...

Page 44: ...right corner while removing it from the sheet of labels The adhesive on the vinyl labels is extremely strong Carefully align the label to the indented outline on the module end and preprocessor unit...

Page 45: ...served by the preproces sor unit the data acquired by the logic analyzer will be inaccurate The TMSSY2 product supports only a quad pumped data bus The TMSSY2 product supports only a double pumped add...

Page 46: ...Appendix 32 TMSSY2 mPGA479 Socket Hardware Support...

Page 47: ...21 BCKL timing 21 clock rate 20 power requirements 20 setup time 20 source synchronous capture disabled 20 Environmental specifications 21 altitude 22 electrostatic immunity 22 humidity 22 temperatur...

Page 48: ...ations 17 airflow clearance 5 electrical 17 environmental 21 mechanical dimensions 26 27 Standard accessory 29 Storage long term 13 Support package setup software 10 T TLA7AX4 probes measurements 2 TL...

Reviews: