Performance Tests
TDS 500D, TDS 600B & TDS 700D Performance Verification and Specifications
1–65
3. Confirm CH 3 (AUX 1 on some TDS models) output is within limits for gain:
a. Measure gain:
H
Move the precision 50
W
cable from the rear-panel DELAYED
TRIGGER OUTPUT BNC to the rear-panel CH 3/AUX 1 BNC
(SIGNAL OUT on some models).
H
Push TRIGGER MENU.
H
Press the main-menu button Source.
H
Press the side-menu button Ch3.
(Ax1 on some TDS models)
H
Set vertical SCALE to 100 mV.
H
Press SET LEVEL TO 50%.
H
Press MEASURE; then press the main-menu button Select
Measrmnt for Ch2.
H
Repeatedly press the side-menu button –more– until Pk-Pk appears
in the side menu (its icon is shown at the left). Press the side-menu
button Pk-Pk.
H
Press CLEAR MENU.
b. Check against limits: (Skip the first four subparts of this substep for the
TDS 794D only.)
H
CHECK that the readout Ch2 Pk-Pk is between 80 mV and 120 mV,
inclusive, for the TDS 600B or is between 88 mV and 132 mV,
inclusive, for the TDS 500D/700D.
H
Enter voltage on test record.
H
Press VERTICAL MENU; then press the side-menu button
to
toggle to the 50
W
setting.
H
Press CLEAR MENU.
H
CHECK that the readout Ch2 Pk-Pk is between 40 mV and 60 mV,
inclusive, for the TDS 600B or is between 44 mV and 66 mV,
inclusive, for the TDS 500D/700D.
H
Enter voltage on test record.
4. Disconnect the hookup: Disconnect the cables from the channel inputs and
the rear panel outputs.
Summary of Contents for TDS 500D
Page 4: ......
Page 15: ...Performance Verification Procedures...
Page 16: ......
Page 119: ...Specifications...
Page 120: ......
Page 130: ...Specifications 2 10 TDS 500D TDS 600B TDS 700D Performance Verification and Specifications...
Page 138: ...Nominal Traits 2 18 TDS 500D TDS 600B TDS 700D Performance Verification and Specifications...
Page 153: ......
Page 154: ......