Operating Instructions
—7A42
Press
the
GND
pushbutton
24
and
notice
that the
CH4
GND
indicator
25
is
illuminated
and
that
a
baseline
trace is
displayed
for
CH4.
Use
the
CH4
POSITION
control
26
to
move the
CH4
trace
to
the second
horizontal
graticule
line
up
from
the
bottom
of
the
crt
27.
This
is
the
CH4
ground
reference.
Press
the
GND
pushbutton
28
again
and
notice
that
the
CH4 waveform
is
again
displayed
29.
Notice
that
CH4
is
set
for 5
V/div
30.
Set
the
pulse
generator amplitude
controls
so
that
the
most
positive
output
level
is
1
division
31
above
the
ground
reference
and
the
most
negative
level
is
at
the
ground
reference
29.
2-41