5.3 Commissioning
All operations related to the system installation and commissioning must be performed by a
skilled electrician.
The two empty columns of the type label inside the central battery unit shall be marked with the
total load connected to the central battery unit and the nominal battery mode duration.
5.3.1 Setting of battery capacity
The charging current has been set to minimum at the factory. The charging current must be set /
checked as follows:
1. Set the current on the TS5 XST0201(B) DIP switch according to the guidelines in the illustration
below.
NOTE:
The charging current must ALWAYS be set / checked based on the number of ampere-hours
(Ah) in the batteries used. Incorrect settings may damage the batteries. When all dip switches are set to
'OFF' position, the charging current is set correctly for 65 Ah batteries. Other battery sizes are as shown
in the sticker. The sticker shows a setting for a 7 Ah charging current as an example.
NOTE: THE CHARGING CURRENT SHALL ALWAYS BE SET WITH MAINS SUPPLY OFF. ONLY
ONE DIP SWITCH IS ALLOWED TO BE SWITCHED ON AT THE SAME TIME.
1 = 7 Ah
2 = 17 Ah
3 = 24 Ah
4 = 38 Ah
ALL OFF = 65 Ah
5 = NC
6 = NC
Button for forced charge
of batteries
Summary of Contents for TKT68C
Page 42: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 42...
Page 43: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 43...
Page 44: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 44...
Page 45: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 45...
Page 46: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 46...
Page 47: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 47...
Page 48: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 48...
Page 49: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 49...
Page 50: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 50...
Page 52: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 52...
Page 53: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 53...
Page 54: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 54...
Page 55: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 55...
Page 56: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 56...
Page 57: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 57...
Page 58: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 58...
Page 59: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 59...
Page 60: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 60...