background image

STEP 7: Fasten to Power Bracket with Machine Screws included with Locking Bolts Kit. If
Double Sided Power Box is specified, continue on the other side, repeating steps 6 and 7.

STEP 6: Push Receptacles with arrows facing up in place with as shown.

STEP 8: After all necessary connection are done (Harness, Base Feed, Ceiling Feed), install
Panel Walls Fascias (for detailed instructions see DIS_201, 202) and Bezel.

E

C3

D

WARNING! *Do not connect to power source until installation is complete. *Connection to the building power source must be performed by a licensed electrician. *Not following these instruction

could result in dam

age and/or injury. *It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations.

Section:
Description:

Page No:

Date: 

INSERT RECEPTACLES ON POWER BOX

SECURING 

FASCIA AND BEZEL INSTALLATION

DIS_901a

11 of 11

Dec 2015

district

Summary of Contents for District

Page 1: ... x1 B2 Mounting Bracket MPA25 E079L R x 1pair B3 Machine Screw FS8 32x0 75QR2 x 4 E Receptacle Ordered separately UNQRO x2 Single Sided x4 Double Sided UNQP Bracket Kit x1 C1 Hex Flange Locking Bolt FN5 16 18x2HB x2 C2 Lock Nut FN5 16 18HB x2 D Power Data Bezel Double PB02 E095 x1 Single Sided x2 Double Sided OR Power Data Bezel Single PB02 E096 x1 Single Sided x2 Double Sided B1 B3 E C1 B2 C2 A B...

Page 2: ...l installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date DOUBLE BOX ALL PANEL WALL WIDTHS ...

Page 3: ...power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date SINGLE BOX 24 WIDE PANEL WALL Dec 2015 3 of 11 DIS_901a district ...

Page 4: ...rce must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date SINGLE BOX 30 36 WIDE PANEL WALL Dec 2015 4 of 11 DIS_901a district ...

Page 5: ...nnection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date SINGLE BOX 39 96 WIDE PANEL WALLS Dec 2015 5 of 11 DIS_901a di...

Page 6: ...e you line up correct holes using guide from page 2 B3 A B3 B2 C1 WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accord...

Page 7: ... to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations NOTE If over Horizontal Tube configuration is...

Page 8: ...nstructions see DIS_201 202 and Bazel s E C3 D WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicabl...

Page 9: ...as per guide on page 2 B2 C1 B3 A B3 B1 WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes...

Page 10: ...Box for both left hand and right hand location C2 5 3 4 5 WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance wit...

Page 11: ...instructions see DIS_201 202 and Bezel E C3 D WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable...

Reviews: