STEP 7: Fasten to Power Bracket with Machine Screws included with Locking Bolts Kit. If
Double Sided Power Box is specified, continue on the other side, repeating steps 6 and 7.
STEP 6: Push Receptacles with arrows facing up in place with as shown.
STEP 8: After all necessary connection are done (Harness, Base Feed, Ceiling Feed), install
Panel Walls Fascias (for detailed instructions see DIS_201, 202) and Bezel.
E
C3
D
WARNING! *Do not connect to power source until installation is complete. *Connection to the building power source must be performed by a licensed electrician. *Not following these instruction
could result in dam
age and/or injury. *It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations.
Section:
Description:
Page No:
Date:
INSERT RECEPTACLES ON POWER BOX
SECURING
FASCIA AND BEZEL INSTALLATION
DIS_901a
11 of 11