![Teknion District Installation Manual Download Page 10](http://html.mh-extra.com/html/teknion/district/district_installation-manual_1076849010.webp)
STEP 5: Insert Locking Bolts and install Power Box assembly under horizontal tube, securing
in place by Lock Nuts. To choose right location, measure 5.3" from vertical tube to edge of
Electrical Box, or 4.5" from plastic cage as shown on the Detail.
The distance between face of Panel Wall vertical tube has to be 5.3" for both Single and Double
Power Box, for both left hand and right hand location.
C2
5.3"
4.5"
WARNING! *Do not connect to power source until installation is complete. *Connection to the building power source must be performed by a licensed electrician.*Not following these instruction
could result in damage and/or injury. *It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations.
Section:
Description:
Page No:
Date:
INSTALLING UNDER HORIZONTAL TUBE
DETAIL 2
DIS_901a
10 of 11
Dec 2015
district