The functioning of the stove depends largely on 
the  quality  and  conservation  conditions  of  the 
pellets, for this reason they must be stored in a 
dry  place  where  they  do  not  reach  too  low 
temperatures. 

Poor  packaging  of  the  pellets  can  lead  to  the 
breakdown  of  particles  and  create  sawdust. 
Sawdust is responsible for the malfunction of the 
power system and can block it. 

 

We recommend storing a few bags of pellets 

in  a  warm  and  dry  place,  because  cold  pellets 
(5º.C) and/or damp reduce the calorific value of 
the  fuel  and  cause  more  dirt,  requiring  more 
rigorous maintenance and cleaning. 

 

6. 

U

NLOADING AND TRANSPORT

 

The stove must be transported vertically without 
rocking during the entire transport process. 

The stove's brazier as well as other components 
can come loose causing damage to the product. 

The  stove's  packaging  must  not  be  impacted  or 
hit by other objects or equipment, under penalty 
of  causing  damage  that  will  compromise  the 
stove's future operation. 

Make sure that the means of transport used has 
a capacity greater than the weight of the stove. 

 

7. 

I

NSTALLATION

 

 

To  obtain  the  best  performance  from  the  stove 
and  uniform  heating  of  the  room,  you  must 
comply with some essential rules. 

Improper installation will compromise the safety 
and proper functioning of the stove. 

When  installing  the  equipment,  all  national  and 
local regulations, as well as European standards, 
must be observed. 

 

7.1.  Leveling the stove 

 

The stove must be leveled using a bubble water 
level  and  using  the  rubber  adjustment  feet 
provided. 

 

7.2.  Installation constraints 

 

It  must  be  safeguarded  that  no  mechanical 
exhaust  fans  or  collective  ventilation  ducts  are 
installed at the installation site. 

In  any  case,  it  must  be  safeguarded  that  the 
installation site is not in a depression, preventing 
the  simultaneous  operation  of  the  systems 
mentioned above, since this will compromise the 
normal  functioning  of  the  stove  and  possible 
release  of  dangerous  fumes.  Check  point  13- 
Models  and  technical  characteristicsfor  more 
information. 

 

7.3.  Stove installation location 

 

The  following  figure  indicates  the  minimum 
distances  (in  centimeters)  from  combustible 
surfaces  that  must  be  observed  when  installing 
the  stove.  In  the  case  of  non-flammable 
walls/objects these distances can be reduced by 
half. 

 

 

Figure 2- Minimum dimensions to respect in relation to 

adjacent surfaces 

 

The  floor  protection  to  support  the  stove  must 
guarantee  fire  resistance  in  accordance  with 
European  standards.  Never  place  the  stove 
directly  on  wood,  carpet  or  other  combustible 
materials. 

 

Summary of Contents for EBONY

Page 1: ...TEK Biomasse 2022 NG01 K100 EN220831 EBONY SLIM Pellet stove Instruction Manual...

Page 2: ...2...

Page 3: ...ation 12 7 9 1 Calculation of thermal power and average hourly consumption 12 8 Use of the stove 12 8 1 Useful information 12 8 2 Lighting 12 8 3 Stop 12 8 4 Unplug the device from the mains 13 8 5 K1...

Page 4: ...nd health and domestic animals 1 3 Packaging of documentation This manual as well as any other applicable documentation must be stored diligently so that it is available at all times In case of moving...

Page 5: ...ctive or out of calibration On water models the installer must inform the user of the following In case of water leaks it is necessary to turn off the water supply and immediately notify technical sup...

Page 6: ...resulting from improper use or negligence lack of maintenance installation in violation of current regulations and laws Use of poor quality pellets or any other similar product in disregard of the pr...

Page 7: ...is the only fuel indicated for this equipment Yield and power vary depending on the quality of pellets used For correct operation you must use pellets according to the characteristics below Technical...

Page 8: ...comply with some essential rules Improper installation will compromise the safety and proper functioning of the stove When installing the equipment all national and local regulations as well as Europe...

Page 9: ...n chamber through an air inlet located at the back of the stove which can be channeled to the outside You must not use bends or tubes with a section smaller than 60mm nor a maximum length greater than...

Page 10: ...erted installation male downwards to prevent condensation from flowing out of the chimney For chimneys over 5 meters high their section must change to a diameter of 100 mm after 5 meters The dimension...

Page 11: ...out by qualified personnel according to EN 10683 Ensure that the electrical installation is earthed With the switch off connect the cable to the wall socket and plug Figure 7 Turn on the switch to el...

Page 12: ...ned off The ash compartment must not be opened while the stove is operating Wait for it to stop and cool down completely to clean the ash Simultaneous use with other ventilation systems see point 7 2...

Page 13: ...Panel shows Time and date chrono activation combustion heating power operating mode room temperature and required main temperature keys Occupation P1 Exit Menu Submenu P2 Ignition Extinguishing press...

Page 14: ...maximum value of the temperature scale probe Open door You must close the door door Delay in stopping the equipment The equipment was turned off when it was on Wait for this operation to complete OFF...

Page 15: ...displayed a automatic combustion m manual combustion and the operating power of the system Heating By entering this menu you can change the heating power You can configure it in automatic or manual mo...

Page 16: ...s are the same for every day of the week Weekend Select between Monday to Friday and Saturday to Sunday times and set the ignition and extinguishing time Refill This menu allows you to activate the fu...

Page 17: ...n level to automatic Keyboard Menu Shine Allows you to adjust the brightness of the panel Contrast Allows you to adjust the panel contrast My Light Allows you to adjust the minimum brightness of the p...

Page 18: ...ty of the pellets used Figure 9 Brazier Put the brazier back in place ensuring the perfect alignment of the resistance hole with the respective resistance Incorrect alignment can cause ignition failur...

Page 19: ...d between the central fins of the grid as shown in the picture below Open the combustion chamber door remove the brazier and vacuum the ash using an ash vacuum Remove the ash drawer and open the lower...

Page 20: ...back panel just remove the screws Removing the alter panels implies loosening 2 screws as shown in the picture Pull the panel upwards by detaching them as shown in the image Loosen the screw as marked...

Page 21: ...not to damage the blades 9 3 1 Chimney cleaning Chimney cleaning should be carried out at least twice a year at the beginning and middle of the winter season or when necessary This cleaning must be ca...

Page 22: ...ucture and or scrape the paint 9 5 End of season maintenance At the end of the heating season you must have your stove completely serviced by a specialized technician This maintenance is intended to e...

Page 23: ...ature lack of fuel Occurs if the smoke temperature drops below the minimum value set for extinguishing Lack of fuel Low calorific fuel Too down correction of pellet recipe Refill hopper Check fuel qua...

Page 24: ...n vessel is confirmed Er11 Internal clock error Incorrect day and time due to prolonged absence of power supply The boiler has been disconnected from power for a long time and the internal battery has...

Page 25: ...eference value not reached Possible obstruction of the chimney or air intake Open ash door or drawer Clean the chimney Check door seal and ash drawer Er42 Air flow mass sensor During the Check Phase U...

Page 26: ...26 11 ELECTRICAL SCHEME...

Page 27: ...27 12 DIMENSIONS AND CONNECTIONS EBONY model...

Page 28: ...28 SLIM Model...

Page 29: ...7 9 4 8 7 9 4 8 Air Pellet consumption kg h 1 91 0 99 1 91 0 99 Autonomy H 6 80 12 10 6 80 12 10 Performance 86 85 86 85 CO to 13 O 2 ppm 0 01 0 01 0 01 0 01 Mass flow of smoke g s 7 52 6 99 7 52 6 99...

Page 30: ...30...

Page 31: ...31...

Page 32: ...and Factory 1 Factory 2 Estrada dos Guilhermes 27 Moinho de Vento 1 E 2405 012 Maceira LRA 2405 008 Maceira LRA Portugal Portugal Phone 351 244 770 240 comercial grupovm pt www tekbiomasse com Authori...

Reviews: