background image

 

 

  Do  not  make  electrical  connections  with 

temporary or non-insulated cables. 

Check  that  the  equipment  ground  connection  is 
effective. 

 

Before starting the unpacking and assembling or 
disassembling of the stove, the Technician must 
take the safety measures prescribed by law, with 
special attention to those mentioned below: 

 

Ensure that the equipment installation site 
complies  with  all  national  and  European 
regulations/laws; 

 

Ensure  the  use  of  all  personal  protective 
equipment; 

 

Make sure that the workplace is in a safe 
condition to perform the installation; 

 

To  perform  the  installation,  the  installer 
must be in full psychophysical conditions; 

 

No  work  should  be  carried  out  under 
adverse conditions. 

 

During 

maintenance 

operations, 

the 

technician  must  carefully  observe  the  following 
instructions: 

 

Maintenance should only be carried out by 
qualified personnel, at least once a year; 

 

Check  that  the  stove  is  cold  before 
carrying out any type of work; 

 

Disconnect  the  equipment  from  the 
electrical 

current 

before 

starting 

maintenance work; 

 

Use personal protective equipment and/or 
other means of protection; 

 

All electrical and mechanical components 
guarantee  the  correct  functioning  of  the 
stove,  so  they  can  only  be  replaced  by 
original  components  purchased  from  the 
brand's technical assistance; 

 

The  equipment  must  be  taken  out  of 
service  if  any  safety  component  is 
defective or out of calibration. 

 

 

On water models, the installer must inform 

the user of the following: 

 

In case of water leaks, it is necessary to 
turn off the water supply and immediately 
notify technical support. 

 

System  pressure  operation  must  be 
checked periodically. 

 

2.2.  User 

 

Before using for the first time, the user must read 
this manual in its entirety and  bear in mind the 
following: 

 

Immediately  disconnect  the  equipment 
from  the  power  supply  in  the  event  of  a 
breakdown or malfunction; 

 

The power plug must be easily accessible; 

 

When  in  normal  operation,  never 
disconnect  the  appliance  from  the 
electrical supply; 

 

If you are not going to use the stove for a 
long period of time, disconnect the power 
and remove the pellets from the hopper; 

 

After a more or less prolonged downtime, 
the stove should be regularly serviced; 

 

The stove must not be switched on without 
having carried out the daily maintenance 
and/or  inspection  as  referred  to  in  point 
9.2.1- Daily ; 

 

This stove 

does not 

work with wood, use 

only 100% wood pellets as fuel according 
to  the  manufacturer's  recommendations. 
See point 5.1- Fuel characteristics; 

 

 This equipment is not an incinerator 

do not use foreign substances as fuel; 

 

It  is  forbidden  to  operate  the  equipment 
with the door open or with broken glass, 
or  even  to  open  the  door  with  the 
equipment in operation; 

 

The equipment lights up automatically, so 
you should not use any product to light the 
stove, especially flammable liquids; 

 

When in operation, the stove has very hot 
surfaces,  so  you  should  not  approach  or 
touch them, with special emphasis on the 

Summary of Contents for EBONY

Page 1: ...TEK Biomasse 2022 NG01 K100 EN220831 EBONY SLIM Pellet stove Instruction Manual...

Page 2: ...2...

Page 3: ...ation 12 7 9 1 Calculation of thermal power and average hourly consumption 12 8 Use of the stove 12 8 1 Useful information 12 8 2 Lighting 12 8 3 Stop 12 8 4 Unplug the device from the mains 13 8 5 K1...

Page 4: ...nd health and domestic animals 1 3 Packaging of documentation This manual as well as any other applicable documentation must be stored diligently so that it is available at all times In case of moving...

Page 5: ...ctive or out of calibration On water models the installer must inform the user of the following In case of water leaks it is necessary to turn off the water supply and immediately notify technical sup...

Page 6: ...resulting from improper use or negligence lack of maintenance installation in violation of current regulations and laws Use of poor quality pellets or any other similar product in disregard of the pr...

Page 7: ...is the only fuel indicated for this equipment Yield and power vary depending on the quality of pellets used For correct operation you must use pellets according to the characteristics below Technical...

Page 8: ...comply with some essential rules Improper installation will compromise the safety and proper functioning of the stove When installing the equipment all national and local regulations as well as Europe...

Page 9: ...n chamber through an air inlet located at the back of the stove which can be channeled to the outside You must not use bends or tubes with a section smaller than 60mm nor a maximum length greater than...

Page 10: ...erted installation male downwards to prevent condensation from flowing out of the chimney For chimneys over 5 meters high their section must change to a diameter of 100 mm after 5 meters The dimension...

Page 11: ...out by qualified personnel according to EN 10683 Ensure that the electrical installation is earthed With the switch off connect the cable to the wall socket and plug Figure 7 Turn on the switch to el...

Page 12: ...ned off The ash compartment must not be opened while the stove is operating Wait for it to stop and cool down completely to clean the ash Simultaneous use with other ventilation systems see point 7 2...

Page 13: ...Panel shows Time and date chrono activation combustion heating power operating mode room temperature and required main temperature keys Occupation P1 Exit Menu Submenu P2 Ignition Extinguishing press...

Page 14: ...maximum value of the temperature scale probe Open door You must close the door door Delay in stopping the equipment The equipment was turned off when it was on Wait for this operation to complete OFF...

Page 15: ...displayed a automatic combustion m manual combustion and the operating power of the system Heating By entering this menu you can change the heating power You can configure it in automatic or manual mo...

Page 16: ...s are the same for every day of the week Weekend Select between Monday to Friday and Saturday to Sunday times and set the ignition and extinguishing time Refill This menu allows you to activate the fu...

Page 17: ...n level to automatic Keyboard Menu Shine Allows you to adjust the brightness of the panel Contrast Allows you to adjust the panel contrast My Light Allows you to adjust the minimum brightness of the p...

Page 18: ...ty of the pellets used Figure 9 Brazier Put the brazier back in place ensuring the perfect alignment of the resistance hole with the respective resistance Incorrect alignment can cause ignition failur...

Page 19: ...d between the central fins of the grid as shown in the picture below Open the combustion chamber door remove the brazier and vacuum the ash using an ash vacuum Remove the ash drawer and open the lower...

Page 20: ...back panel just remove the screws Removing the alter panels implies loosening 2 screws as shown in the picture Pull the panel upwards by detaching them as shown in the image Loosen the screw as marked...

Page 21: ...not to damage the blades 9 3 1 Chimney cleaning Chimney cleaning should be carried out at least twice a year at the beginning and middle of the winter season or when necessary This cleaning must be ca...

Page 22: ...ucture and or scrape the paint 9 5 End of season maintenance At the end of the heating season you must have your stove completely serviced by a specialized technician This maintenance is intended to e...

Page 23: ...ature lack of fuel Occurs if the smoke temperature drops below the minimum value set for extinguishing Lack of fuel Low calorific fuel Too down correction of pellet recipe Refill hopper Check fuel qua...

Page 24: ...n vessel is confirmed Er11 Internal clock error Incorrect day and time due to prolonged absence of power supply The boiler has been disconnected from power for a long time and the internal battery has...

Page 25: ...eference value not reached Possible obstruction of the chimney or air intake Open ash door or drawer Clean the chimney Check door seal and ash drawer Er42 Air flow mass sensor During the Check Phase U...

Page 26: ...26 11 ELECTRICAL SCHEME...

Page 27: ...27 12 DIMENSIONS AND CONNECTIONS EBONY model...

Page 28: ...28 SLIM Model...

Page 29: ...7 9 4 8 7 9 4 8 Air Pellet consumption kg h 1 91 0 99 1 91 0 99 Autonomy H 6 80 12 10 6 80 12 10 Performance 86 85 86 85 CO to 13 O 2 ppm 0 01 0 01 0 01 0 01 Mass flow of smoke g s 7 52 6 99 7 52 6 99...

Page 30: ...30...

Page 31: ...31...

Page 32: ...and Factory 1 Factory 2 Estrada dos Guilhermes 27 Moinho de Vento 1 E 2405 012 Maceira LRA 2405 008 Maceira LRA Portugal Portugal Phone 351 244 770 240 comercial grupovm pt www tekbiomasse com Authori...

Reviews: