SYSTEM CHECK:
After connecting the two power connectors, it's time to make a system check. To check
the system it's necessary to have full GPS signal so the vehicle must be placed outside.
Check AUTO mode:
SPRAYDOS Controller:
• Set the section switch's off
• Set the Master switch on
• Turn the SPRAYDOS on
CL230:
• Turn the CL230 on
• Encode the number of sections and the width of each
(Refer to the CL230 user manual)
• Wait for DGPS (Green LED on)
• Set the mode to AUTO
• Drive forward (Min. Speed 2.3 km/h)
• Observe that all sections and the master valve open.
• Check that the Master valve closes when the Master switch is set off.
• Check hectare counter in CL230 against SPRAYDOS.
Check MAN mode:
CL230:
• Set the mode to MAN
SPRAYDOS Controller:
• Set the section switch's on
• Set the Master switch on
• Observe that all sections and the master valve open.
Check in the 'Boom Section Control Screen' that the
section icons turn off and on according to the valve/
switch status.