26
M.
SECOSTEEL-PRO 30R290
-01 Manual _ITA_UK_DE_FR_ES_DK - 23/04/2021
EN
3
Preliminary operations
3.1
Packaging removal
Remove the packaging taking care not to damage the unit. Dispose of the packaging products
(wood, plastic, cardboard) and send them to be specialized collection or recycling centres (follow
local regulations in force.
3.2
Inspection
All units are assembled and wired at the factory. Upon receipt of the unit, it must be inspected
immediately, carefully checking that it has not been damaged during transport or that there are no
missing parts; any complaints must be notified to the carrier and the factory or his representative
within 8 days.
Before use, check in particular that there are no dents on the external metal
panels, including those of the tank compartment. Also check that the cable, plug
and relative insulation are intact. Otherwise, it is FORBIDDEN to connect and
start the unit, which must be sent to an authorized service centre.
3.3
Operating limits
The following diagram represents the operating range of standard units.
Warning:
It is strongly recommended to operate the unit within the limits shown below.
Overcoming these limits does not guarantee either the normal operation or the reliability of the
group or even the integrity (for special applications, please contact our office).
Operation table
Note:
On the left is indicated the extension of the operating limits if operating with versions
equipped with a hot gas defrost system.
3.4
Positioning
Place the device in order to guarantee an adequate air flow.
Warning
: Make sure the device is positioned so that it does not come into contact with water.