Commissioning and adjustments:
How to adjust your system perfectly to your needs
Before commissioning your air curtain system, you must ensure that all water installations and
electrical installations have been carried out correctly.
To avoid the risk of electric shock, the heating must be connected before
connecting the electricity. Check that the system is de-energized before
connecting the heating!
All water and electrical installations must be performed by specialist
companies (plumbers, electricians). Teddington Luftschleieranlagen GmbH
can otherwise not assume any warranty (see chapter “Safety”).
Only connect heating pipes with appropriate tools, so that connections
(pipes, heat exchanger connections) are secured to prevent twisting.
Before commissioning all pipes must undergo an expert pressure inspection.
Similarly, all electrical cables must be inspected! Incorrect connection can lead
to danger to life! Important: no safety parts, covers and grounding conductor
connections may be removed.
Measure the fan motor’s electrical input and compare it with the electrical
input data on the model label.
14.1
Basic information: operating modes and fan settings
Depending on the prevailing outside temperature you can choose between two operating modes:
summer or winter. You can also choose between manual and automatic operating mode.
You can choose the power level on the selector switch on the control unit. The control unit is
equipped with a fault alarm system (see operating instructions for the control unit). You can adjust
the air discharge speed of the fans at 5 levels:
Level 1 = min. air discharge speed
Level 5 = max. air discharge speed