background image

TECSYSTEM  S.r.l ® 

Figure 7: connector block 

Figure 6: mounting on transformer 

Fixing bolt minimun 10 MA
with spring washer

Phase (brown)

Ground (yellow/green)

Neutral (blue)

Summary of Contents for Bar 1200

Page 1: ...48600783 06 00 TECSYSTEM S r l Via Cristoforo Colombo 5 C 20094 Corsico MI tel 39 2 48601011 4581861 Fax 39 2 48600783 R 8 05 11 07 MRM 018 07 TECSYSTEM S r l 20094 Corsico MI phone 39 0248601011 024...

Page 2: ...2 TECSYSTEM S r l Bar 1200 1800 3600 protection relays...

Page 3: ...Insulation class B Protection class IP40 Stator height 30 mm Shaft power 50 W Power Consumption 95 W Efficiency 0 53 Current Consumption 0 415 A Power factor Cosn 1 0 No Revolutions minute 2750 Rated...

Page 4: ...r one by one the side fans letting the impeller middle figure 1 match the distance between centers of the coils Bar 1200 from 470 to 585 mm Bar 1800 from 470 to 700 mm Bar 3600 from 670 to 770 mm Fix...

Page 5: ...ar 3600 TG500 fan middle connected with the third ring Bar 1800 TG360 fan middle between the second and the third ring Figure 1 drawing of the impeller middle Barra 1200 TG180 fan middle at the second...

Page 6: ...6 TECSYSTEM S r l Figure 2 fan fixing upper view 8 8 15 A B Brown Blue Yellow green Figure 3 electrical diagram...

Page 7: ...le paying attention to respect a minimum distance flapper coil of 8 cm By tightening the flapper hinge screws it is possible to clamp the posi tion 4 MOUNTING OF THE BAR ON THE TRANSFORMER Connect the...

Page 8: ...8 TECSYSTEM S r l Air flow Air flow Figure 5 air flow direction...

Page 9: ...9 TECSYSTEM S r l Figure 7 connector block Figure 6 mounting on transformer Fixing bolt minimun 10 MA with spring washer Phase brown Ground yellow green Neutral blue...

Page 10: ...10 TECSYSTEM S r l Supply connector block TGA Fans Power cords Input power supply Middle sign Flappers to adjust the air flow output angle...

Page 11: ...11 TECSYSTEM S r l...

Page 12: ...CSYSTEM S r l TEST DECLARATION 1200 1800 3600 BAR N Description Test during production 1 Bar dimensional check OK 2 Fan functional test OK 3 Dielectric strength OK 4 Functional idling test OK Date 05...

Reviews: