TECSYSTEM Bar 1200 Instruction Manual Download Page 7

TECSYSTEM  S.r.l ® 

Side view  

Place the cooling fan unit on  the I-beams of the transformer track in or-
der to direct the air flow inside the coil air ducts (

figure 5

). 

Drill two holes of at least 11 mm where the bar rests on the track and fix it 
with bolts of minimum 10MA, interposing a spring washer as shown in 

figure 6

 
To optimize the flow direction, it is possible to adjust the flapper angle, 
paying attention to respect a minimum distance flapper-coil of 8 cm. 
By tightening the flapper hinge screws, it is possible to clamp the posi-
tion.  

4) MOUNTING OF THE BAR ON THE TRANSFORMER 

Connect the input power supply of each fan with the relevant cable as 
shown in  figures 

8,9,10 and 11

Each cooling fan unit is equipped with a connector block containing a ter-
minal for connection to the mains, as shown in 

figure 7

 

N.B.: in order to assure a suitable  fan protection, we suggest to 
feed them with TECSYSTEM monitoring unit model VRT200. 

5) ELECTRICAL CONNECTIONS 

15

A-B

Figure 4: fan fixing 

Summary of Contents for Bar 1200

Page 1: ...48600783 06 00 TECSYSTEM S r l Via Cristoforo Colombo 5 C 20094 Corsico MI tel 39 2 48601011 4581861 Fax 39 2 48600783 R 8 05 11 07 MRM 018 07 TECSYSTEM S r l 20094 Corsico MI phone 39 0248601011 024...

Page 2: ...2 TECSYSTEM S r l Bar 1200 1800 3600 protection relays...

Page 3: ...Insulation class B Protection class IP40 Stator height 30 mm Shaft power 50 W Power Consumption 95 W Efficiency 0 53 Current Consumption 0 415 A Power factor Cosn 1 0 No Revolutions minute 2750 Rated...

Page 4: ...r one by one the side fans letting the impeller middle figure 1 match the distance between centers of the coils Bar 1200 from 470 to 585 mm Bar 1800 from 470 to 700 mm Bar 3600 from 670 to 770 mm Fix...

Page 5: ...ar 3600 TG500 fan middle connected with the third ring Bar 1800 TG360 fan middle between the second and the third ring Figure 1 drawing of the impeller middle Barra 1200 TG180 fan middle at the second...

Page 6: ...6 TECSYSTEM S r l Figure 2 fan fixing upper view 8 8 15 A B Brown Blue Yellow green Figure 3 electrical diagram...

Page 7: ...le paying attention to respect a minimum distance flapper coil of 8 cm By tightening the flapper hinge screws it is possible to clamp the posi tion 4 MOUNTING OF THE BAR ON THE TRANSFORMER Connect the...

Page 8: ...8 TECSYSTEM S r l Air flow Air flow Figure 5 air flow direction...

Page 9: ...9 TECSYSTEM S r l Figure 7 connector block Figure 6 mounting on transformer Fixing bolt minimun 10 MA with spring washer Phase brown Ground yellow green Neutral blue...

Page 10: ...10 TECSYSTEM S r l Supply connector block TGA Fans Power cords Input power supply Middle sign Flappers to adjust the air flow output angle...

Page 11: ...11 TECSYSTEM S r l...

Page 12: ...CSYSTEM S r l TEST DECLARATION 1200 1800 3600 BAR N Description Test during production 1 Bar dimensional check OK 2 Fan functional test OK 3 Dielectric strength OK 4 Functional idling test OK Date 05...

Reviews: