Tecom Smart Portable Vibration Diagnosis Instrument operation manual
Page 18
14.
Installation Reference
14-1 Vertical
When the vibration gauge is installed in the vertical direction, it should be placed
just above the rotating shaft. At this time, the Z-axis of the vibration gauge is the
vertical direction. Please note that the two legs of the magnet are parallel to the
rotating shaft so that they can be fixed on the arc surface of the motor on.
Y
X
Y
X
Z
Y
X
Z
Y
X
X
Z
X
X
Z
X
When using the vertical installation
position, the figure represents the
measured correct X, Y, Z vibration axis.