4
rev. RPA-v2_0_en
5
Connect wires to terminal blocks
Name
Terminal function
SLC
1
А, В
Connecting the data SLC1
+, -
Connecting the power SLC1
SLC
2
А, В
Connecting the data SLC2
+, -
Connecting the power SLC2
U1, GND
Input for connecting the main
power supply
U2, GND
Input for connecting a backup
power supply
А485В, GND,
А485В
RS-485 interface for connecting to the control
panel and organizing a ring interface (terminals
SLC for connecting incoming and outgoing inter-
faces are chosen arbitrarily)
6
Register the RPA in the Control Panel see p. 6.1.
7 Test the RPA
1)
Check according to the indication on the RPA, in the PKM Astra
Pro or on the screen "Astra-812 Pro" the status of the RPA (the sta-
tus "Normal" should be displayed)
2)
Run test mode according to User guide. Control the issuance of
notifications on the Control Panel
9.4
If the length of the radial topology SLC is more than 800 m, it is
recommended to install a 100 Ohm terminating resistor (from the de-
livery set) at the SLC point farthest from the RPA to match the Data
line.
R1, R2
– resistor 100Ohm.
Pic.3
10 Warranty
The operation warranty period is 5 years from the date of operation
start-up, but no longer than 5 years 6 months from the date of manu-
facturing subject to the requirements of User guide
Manufacturer:
ZAO NTC TEKO
420108, Russia, Kazan,
Gafuri str., 71
Tel.:+7(843) 528-03-69
Made in Russia
More than 800 m
Not more than 250 addressable devices
RPA