7 CHAPTER 7
– INSTALLATION
Only skilled technicians, appointed by the manufacturer, or by authorized
dealers, must be allowed to carry out installation. serious damage to people and
to the lift can be caused if installations are made by unskilled personnel.
Before carrying out any operations, remember to insert the safety piece of wood
between the lower booms and the base frame
(R
IF
.
FIG
.
15).
Before compressed air connection, fill in the hydraulic cylinders with oil.
.
Figure 15 - SAFETY BLOCK
PRELIMINARY OPERATIONS
7.1
CHECKING FOR ROOM SUITABILITY
The lift has been designed to be used in
covered and sheltered places
.
The place of installation must not be next to washing areas, painting workbenches, solvent or
varnish deposits. The installation near to rooms, where a dangerous situation of explosion can
occur, is strictly forbidden. The relevant standards of the local Health and Safety at Work
regulations, for instance, with respect to minimum distance to wall or other equipment, escapes and
the like, must be observed.
7.2
LIGHTING
Lighting must be carried out according to the effective regulations of the place of installation. All
areas next to the lift must be well and uniformly lit.
1
1
64
Summary of Contents for 300 SPECIAL
Page 14: ...Figura 4 LAYOUT PSS MONOFORBICE WITH ESTENSION 51 ...
Page 15: ...Figura 4a LAYOUT PSS MONOFORBICE WITH FLAP 52 ...
Page 16: ...Figura 4b LAYOUT PSS MONOFORBICE ESTENSION WITH FRAME 53 ...
Page 17: ...Figura 4c LAYOUT PSS MONOFORBICE FLAP WITH FRAME 54 ...
Page 21: ...Figure 7 ELECTRICAL DIAGRAM 58 ...
Page 29: ...Figure 16 HIDRAULIC HOSE CONECTION 66 A B F C ...