I.T.S. Ital Trade Services PT 355 Operating Manual
16
5.1
Welding Parameters for PE & PP sheets,pipes & fittings according to DVS 2207-1 – 2207-11
Nominal Wall thickness
mm
Alignment
Bead height on heater
plate at the end of the
alignment time (alignment
under 0.15 N/mm
2
)
mm (minimum values)
Heating-up
Heating-up time= 10 x
wallthickness (heating-
up 0.02 N/mm
2
)
s
Changeover time
S (maximum time)
Joining pressure
s
Cooling time under
joining pressure p=0.15
N/mm2 0.01
Min (minimum values)
MATERIAL PE
Until 4.5
0.5
45
5
5
6
4.5 … 7
1.0
45 … 70
5 … 6
5 … 6
6 … 10
7 … 12
1.5
70 … 120
6 … 8
6 … 8
10 … 16
12 … 19
2.0
120 … 190
8 … 10
8 … 11
16 … 24
19 … 26
2.5
190 … 260
10 … 12
11 … 14
24 … 32
26 … 37
3.0
260 … 370
12 ... 16
14 … 19
32 … 45
37 … 50
3.5
370 … 500
16 … 20
19 … 25
45 … 60
50 ... 70
4.0
500 … 700
20 … 25
25 … 35
60 … 80
MATERIAL PP
Until 4.5
0.5
135
5
6
6
4.5 … 7
0.5
135 … 175
5 … 6
6 … 7
6 … 12
7 … 12
1.0
175 … 245
6 … 7
6 … 11
12 … 20
12 … 19
1.0
245 … 330
7 … 9
11 … 17
20 … 30
19 … 26
1.5
330 … 400
9 … 11
17 … 22
30 … 40
26 … 37
2.0
400 … 485
11 ... 14
22 … 32
40 … 55
37 … 50
2.5
485 … 560
14 … 17
32 … 43
55 … 70
Example on how to calculate the cooling down (t5) time following the DVS NORM
As per drawing above the time
T
corresponds to wall thickness value
X in
mm
. To calculate this time (t5 in minutes) please follow the formula below:
Example:
If you want to calculate the cooling down time for a
6mm
wall thickness pipe, you must simply substitute the variable
X
with the value
6
:
min
,
)
,
(
,
T
4
8
5
4
6
5
4
7
6
10
6
=
−
⋅
−
−
+
=
To calculate the other times (
t3
and
t4
) you must use the same principle of linear interpolation.
To obtain the
t2
(in seconds) value use the formula below where the variable wt corresponds to the nominal wall thickness
)
mm
(
wt
(sec)
T
⋅
=
10
2
)
5
,
4
(
5
,
4
7
6
10
6
−
⋅
−
−
+
=
x
T
Summary of Contents for I.T.S. PT 355
Page 1: ...I T S by Tecnodue PT 355 Edition 1208 Operating Manual ...
Page 28: ...I T S Ital Trade Services PT 355 Operating Manual 28 10 3 Hydraulic plan ...
Page 29: ...I T S Ital Trade Services PT 355 Operating Manual 29 11 Exploded view and spare parts list ...
Page 31: ...I T S Ital Trade Services PT 355 Operating Manual 31 ...