
TECHNICAL AND MAINTENANCE MANUAL
Graph VENTILATOR
Review : 04
Date: 09/05/06
37
Sensor Inspection
Pneumotacograph:
AirVal and OxyVal:
1) -
Connect the flow analyzer in the Patient outlet (Fig.:1).
2)-
Open the air/Oxy valve until 160 L/min.
3)-
Check if the reading of the first column
Air Flow
is below 1024.
4)
- Close valves with
"Reset"
key.
Peep valve (
Peepval
):
1)-
Connect the pressure analyzer in the inspiratory outlet (Fig.:2) .
2)-
Select PeepVal
2)-
Open it progressively with
“
selection
”
.
3)-
Check the maximum value of the pressure must be between 40 and 70 cmH
2
O.
4)
- Close valves with
"Reset"
key.
Inspiratory valve:
1)-
Connect the pressure analyzer in the inspiratory outlet (Fig.:2).
2)-
Open it with
“
fiO
2
”
key.
3)-
Check the maximum value of the pressure must be between 70 and 130 cmH
2
O.
4)
- Close valves with
"Reset"
key.
Fl
Fig.:1
Flow
Analyzer
Ventilator
Patient outlet
Pressure analyzer
Ventilator
Inspiratory outlet
Fl
Fig.:2
Summary of Contents for NEUMOVENT
Page 1: ...Graph ventilator Technical manual review 04 MAY 2006 ...
Page 3: ...CHAPTER I GENERAL AND OPERATION FEATURES ...
Page 12: ...TECHNICAL AND MAINTENANCE MANUAL Graph VENTILATOR Review 04 Date 09 05 06 9 ...
Page 13: ...TECHNICAL AND MAINTENANCE MANUAL Graph VENTILATOR Review 04 Date 09 05 06 10 ...
Page 30: ...CHAPTER II MAINTENANCE INSTRUCTIONS ...
Page 32: ...CHAPTER III TROUBLE SHOOTING ...
Page 37: ...CHAPTER IV SENSOR VERIFICATION ...
Page 44: ...CHAPTER V EQUIPMENT OPENING AND CLOSURE ...
Page 60: ...CHAPTER VI DETAIL OF ASSEMBLIES ...
Page 70: ...CHAPTER VII ELECTRONIC BOARDS DETAIL ...
Page 78: ...CHAPTER VIII CALIBRATION ...
Page 90: ...CHAPTER IX FINAL CONTROL ...