![Techsis SL-224-H-P300 User Manual Download Page 12](http://html1.mh-extra.com/html/techsis/sl-224-h-p300/sl-224-h-p300_user-manual_1070879012.webp)
SL-224-H-P300
Fax
:021-66402031
Www.techs.is , [email protected]
Page
12
◼
Installation desk requirement
Regardless of whether the switch is installed in a rack or on another horizontal workbench,
be aware of the following:
1.
Make sure the rack or workbench is stable, strong, and can withstand at least 5.5Kg
weight;
2.
Make sure the rack has a good cooling system, or maintain good indoor ventilation;
3.
Make sure the rack is well grounded, the power outlet and switch are within 1.5 meters
◼
Prepare tools for installation
You may need to use a screwdriver during installation, electrostatic wrist strap, fiber optic
cable and other tools to prepare your own
2.2 Product installation
19-inch standard rack installation
SL-224-H-P300 is designed according to the standard 19-inch rack size, you can easily install
to the rack, the specific installation steps are as follows:
First, Check rack grounding and stability
;
Second, Install the two L-brackets in the accessory on each side of the switch panel and secure
with the screws provided in the accessory